1996
Research Reports
| Active and Completed Projects
Research Reports
-
Pedestrian Control at Intersections - Phase I
December 1996 Report no. Mn/DOT 1997-02
-
Development of Traffic Simulation Laboratory For Design Planning and Traffic Operations (Phase I)
December 1996 Report no. CTS 97-11
-
A Lateral Dynamic Model of a Tractor-Trailer: Experimental Validation
November 1996 Report no. Mn/DOT 1997-18
-
Development and application of on-line strategies for optimal intersection control : phase III
October 1996 Report no. Mn/DOT 1996-33
-
ALX : autonomous vehicle guidance for roadway following and obstacle avoidance
October 1996 Report no. Mn/DOT 1997-04
-
Vehicle Navigation and Localization Using Multiple Navigational Aids: Final Report
October 1996 Report no. Mn/DOT P98-4
-
Analysis of a differential global positioning system as a sensor for vehicle guidance
August 1996 Report no. Mn/DOT 1997-17
-
Stresses in steel curved girder bridges
August 1996 Report no. MnDOT 1996-28
-
Creating bicycle transportation networks : a guidebook
July 1996 Report no. Mn/DOT 1996-14
-
Human Factors for Transitway Safety Improvement: Final Report for Phase 1
July 1996 Report no. 1996 Transitway
-
Dynamics and Stability of Capsules in Pipeline Transportation
May 1996 Report no. Mn/DOT 1996-17
-
Storage and Access Methods for Advanced Traveler Information Systems
April 1996 Report no. Mn/DOT 1996-26
-
Development of scaled measures of user and citizen satisfaction with Mn/DOT services
February 1996 Report no. Mn/DOT 1996-15
-
Human factors evaluation of driver multitasking and genesis message formats
February 1996 Report no. Mn/DOT 1996-13
-
Retroflective sheeting materials on highway signs
February 1996 Report no. Mn/DOT 1996-07
-
Shifting global airline service and the local community
January 1996 Report no. MnDOT 1996-02
-
Congestion Costs and Congestion Pricing for the Twin Cities
January 1996 Report no. MnDOT 1996-32
Active and Completed Research Projects
-
Chaotic Dynamics in Traffic Flow (Phase 2)
(12/1996) Status: Completed
-
Data Retrieval and Analysis Tool for Transportation Engineers, Year 3
(12/1996) Status: Completed
-
Mn/DOT - Restoration Wetlands Success
(12/1996) Status: Completed
-
Investigating the Effect of Roadway Design on Driver Behavior
(12/1996) Status: Completed
-
Re-evaluation of Wood Energy Production Policies: Impacts on Transportation, Enviornment, Forest and Agricultural Sector
(12/1996) Status: Completed
-
Quantification of Motor Carrier Safety Program Impacts on Accident Reduction - Phase 2
(12/1996) Status: Completed
-
Northwest Minnesota Commodity Flow Study
(11/1996) Status: Completed
-
Efficacy of Erosion Control Blankets and Soil Stabilizers
(11/1996) Status: Completed
-
Fabric for Reinforcement and Separation in Unpaved Roads
(11/1996) Status: Completed
-
Automatic Detection of Driver Fatigue: Phase 2
(10/1996) Status: Completed
-
Stability of Pile Groups
(09/1996) Status: Completed
-
Monitoring and Assessment Program for Wabasha County Bridge
(09/1996) Status: Completed
-
Vehicle Following (Platooning) Using CCD Cameras - Phase II
(09/1996) Status: Completed
-
An Automatic Visibility Measurement System Based on Video Cameras
(08/1996) Status: Completed
-
Assessing Failure with Acoustic Emissions
(08/1996) Status: Completed
-
Estimation of the Capacity in Freeway Weaving Areas for Traffic Management and Operations
(08/1996) Status: Completed
-
Rollover Protection and Wheelchair Securement: Assessment
(07/1996) Status: Completed
-
Salt Tolerance in Short Stature Native Grasss
(07/1996) Status: Completed
-
Bus Lines as Economic Development Corridors: Retrofitting Bus Lines on Urban Highways
(07/1996) Status: Completed
-
Mobility and Accessibility in Later Life: Assessment, Screening, and Maintenance of Fitness-to-Drive
(07/1996) Status: Completed
-
A Sensory System for Monitoring Safety in Work Zones
(06/1996) Status: Completed
-
Roadside Prairie and Wetland Restoration: Mycorrhizal/Plant Factors
(06/1996) Status: Completed
-
Activation of I-394 Lab for ITS Operational Testing: Phase II
(06/1996) Status: Completed
-
Institutional and Political Issues in Congestion Pricing
(06/1996) Status: Completed
-
System Designs in Pipeline Transportation
(06/1996) Status: Completed
-
SAFETRUCK: Sensing and Control to Enhance Vehicle Safety
(06/1996) Status: Completed
-
Real-Time Traffic Prediction and Control, Phase 3
(06/1996) Status: Completed
-
Evaluation of Timber Bridge Wear Surfaces
(06/1996) Status: Completed
-
Development of Traffic Simulation Laboratory for Design, Planning and Traffic Operations: Phase II
(06/1996) Status: Completed
-
Automated Route Planning and Optimizing Software
(06/1996) Status: Completed
-
Impact of Traffic Safety Improvements
(06/1996) Status: Completed
-
Mn/DOT Cambridge Telecommunicating Center Evaluation Study
(05/1996) Status: Completed
-
Seasonal Changes in Pavement Material Properties
(03/1996) Status: Completed
-
Overseas Air Cargo Service and US Cities
(03/1996) Status: Completed
-
Evaluation of Road-Map Data for Intelligent Transportation Systems
(03/1996) Status: Completed
-
Development of Traffic Control Laboratory (TRAMLAB)
(03/1996) Status: Completed
-
Statistical Analysis of the Sources of Pavement Variability
(03/1996) Status: Completed
-
National Research Study on Transportation Technologies for Sustainable Communities
(03/1996) Status: Completed
-
Magnetic Lateral Indication System Evaluation
(03/1996) Status: Completed
-
Durability and Geographical Considerations in the Design of Asphalt Mixtures
(02/1996) Status: Completed
-
Real Time Prediction of Freeway Occupancy for Congestion Control
(02/1996) Status: Completed
-
Quantification of Mn/DOT Motor Carrier Safety Program Impacts
(02/1996) Status: Completed
-
Identifying Faults in the Traffic Data Network
(01/1996) Status: Completed
-
Acoustic Emission Equipment for Infrastructure Monitoring
(01/1996) Status: Completed