2009
Research Reports
| Active and Completed Projects
Research Reports
-
Rapidly Deployable Low-Cost Traffic Data and Video
Collection Device
December 2009 Report no. CTS 09-21
-
Asphalt Mixture and Binder Fracture Testing for 2008 MnROAD Construction
December 2009 Report no. MnDOT 2009-42
-
Statistical Methods for Materials Testing
December 2009 Report no. Mn/DOT 2009-41
-
Responding to the Unexpected: Development of a Dynamic Data-Driven Model for Effective Evacuation
December 2009 Report no. Mn/DOT 2009-36
-
Estimating Running Time and Demand for a Bus Rapid Transit
Corridor
December 2009 Report no. CTS 09-24
-
Development of Flexural Vibration Inspection Techniques to
Rapidly Assess the Structural Health of Rural Bridge Systems:
Phase II
December 2009 Report no. MnDOT 2009-40
-
Benefit:Cost Analysis of In-Vehicle Technologies and
Infrastructure Modifications as a Means to Prevent Crashes Along Curves and Shoulders
December 2009 Report no. Mn/DOT 2009-39
-
Using Archived Truck GPS Data for Freight Performance
Analysis on I-94/I-90 from the Twin Cities to Chicago
November 2009 Report no. CTS 09-27
-
Understanding the Impacts of Transitways: Demographic and Behavioral Differences between Hiawatha Light-Rail and Other Transit Riders
October 2009 Report no. CTS 09-16
-
Development of Data Warehouse and Applications for
Continuous Vehicle Class and Weigh-in-Motion Data
October 2009 Report no. Mn/DOT 2009-33
-
Hydraulic and Mechanical Properties of Recycled Materials
October 2009 Report no. Mn/DOT 2009-32
-
Demographic and Behavioral Differences between Hiawatha Light-Rail and Other Transit Riders (Research Brief)
October 2009 Report no. CTS Research Brief 2009-01
-
A Computational Study of the I-35W Bridge Collapse
October 2009 Report no. CTS 09-29
-
The Hiawatha Line: Impacts on Land Use and Residential Housing Value (Research Brief)
October 2009 Report no. CTS Research Brief 2009-02
-
Implementation of methodology for weed management practices, Phase II
September 2009 Report no. MnDOT 2009-28
-
Bridge Health Monitoring and Inspections - A Survey of
Methods
September 2009 Report no. Mn/DOT 2009-29
-
Development and Evaluation of a Cellular Phone Based Teen
Driver Support System
September 2009 Report no. CTS 09-22
-
Data Mining of Traffic Video Sequences
September 2009 Report no. CTS 09-25
-
Superbus Phase I: Accessory Loads Onboard a Parallel Hybrid-Electric City Bus
August 2009 Report no. CTS 09-23
-
Social Networks and ICT in Location Choice
August 2009 Report no. CTS 09-19
-
Use of Fly Ash for Reconstruction of Bituminous Roads
August 2009 Report no. Mn/DOT 2009-27
-
Access to Destinations: Application of Accessibility
Measures for Non-Auto Travel Modes
July 2009 Report no. Mn/DOT 2009-24
-
Development of a Platoon-Priority Control Strategy with/out
Smart Advance Warning Flashers for Isolated Intersections with
High-Speed Approaches
July 2009 Report no. Mn/DOT 2009-23
-
Value Capture for Transportation Finance: Report to the Minnesota Legislature
June 2009 Report no. CTS 09-18S
-
Cost Analysis of Alternative Culvert Installation Practices in Minnesota
June 2009 Report no. MnDOT 2009-20
-
Harnessing Value for Transportation Investment: A Summary of the Study: Value Capture for Transportation Finance
June 2009 Report no. CTS 09-18PS
-
The Economic Impact of Upgrading Roads
June 2009 Report no. Mn/DOT 2009-16
-
Technology Enabling Near-Term Nationwide Implementation of
Distance Based Road User Fees
June 2009 Report no. CTS 09-20
-
College and University Campuses in Greater Minnesota as
Traffic Generators
June 2009 Report no. CTS 09-17
-
Value Capture for Transportation Finance: Technical Research Report
June 2009 Report no. CTS 09-18
-
Mechanistic Modeling of Unbound Granular Materials
June 2009 Report no. Mn/DOT 2009-21
-
Subsurface Drainage Manual for Pavements in Minnesota
June 2009 Report no. MnDOT 2009-17
-
Identifying Methods and Metrics for Evaluating Interagency Coordination in Traffic Incident Management
May 2009 Report no. CTS 09-13
-
Feasibility of a Quantitative Rural Safety Policy Improvement Index (RSPII): Phase I
May 2009 Report no. CTS 09-14
-
Real-time Nonintrusive Detection of Driver Drowsiness
May 2009 Report no. CTS 09-15
-
Can Cone Penetration Testing Measure the Resilient Modulus of Soils?
April 2009 Report no. 200736TS
-
Improving Minneapolis/St. Paul's Ramp Metering System for Smoother Traffic Flow
April 2009 Report no. 200751TS
-
Incorporation of Fatigue Detail Classification of Steel Bridges into the Mn/DOT Database
April 2009 Report no. 200722TS
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy Phase I
April 2009 Report no. CTS 09-12
-
Putting Research into Practice: Implementing a Fatigue Detail Classification Scheme for Mn/DOT's Steel Bridges
April 2009 Report no. 2007084TS
-
Biological Control of Canada Thistle
April 2009 Report no. 200738TS
-
Crack and Concrete Deck Sealant Performance
March 2009 Report no. Mn/DOT 2009-13
-
Automatic Detection of RWIS Sensor Malfunctions (Phase II)
March 2009 Report no. CTS 09-11
-
Automatic Detection of RWIS Sensor Malfunctions (Phase I)
March 2009 Report no. CTS 09-10
-
Impending Box Impact Warning System for Prevention of Snowplow-Bridge Impacts: A Final Report of Investigations
February 2009 Report no. CTS 09-08
-
Implementation of Methodology for Weed Management Practices
February 2009 Report no. MnDOT 2009-10
-
Post-Construction Evaluation of Forecast Accuracy
February 2009 Report no. Mn/DOT 2009-11
-
Multiuse, High Accuracy, High Density Geospatial Database
February 2009 Report no. CTS 09-05
-
Transportation Data Research Laboratory: Data Acquisition and Archiving of Large Scaled Transportation Data, Analysis Tool
Developments, and On-Line Data Support
February 2009 Report no. CTS 09-07
-
Technology in Planning and Participatory Processes: Identifying New Synergies through Real World Application
February 2009 Report no. CTS 09-09
-
In-Situ Vehicle Classification Using an ILD and a Magnetoresistive Sensor Array
February 2009 Report no. CTS 09-06
-
Development of a New Tracking System based on CMOS Vision Processor Hardware: Phase I
February 2009 Report no. CTS 09-04
-
Warning Efficacy of Active Versus Passive Warnings for Unsignalized Intersection and Mid-Block Pedestrian Crosswalks
January 2009 Report no. Mn/DOT 2009-03
-
Evaluating Roadway Subsurface Drainage Practices
January 2009 Report no. MnDOT 2009-08
-
Advanced Acquisition of Right-of-Way: Best Practices and Corridor Case Studies
January 2009 Report no. Mn/DOT 2009-07
-
School Choice and Children's School Commuting
January 2009 Report no. CTS 09-01
-
The Effect of Sleep Deprivation on Driving Performance
January 2009 Report no. CTS 09-03
-
Implementation of the MEPDG for New and Rehabilitated Pavement Structures for Design of Concrete and Asphalt Pavements in Minnesota
January 2009 Report no. Mn/DOT 2009-06
-
ITS and Transportation Safety: EMS System Data Integration to
Improve Traffic Crash Emergency Response and Treatment
January 2009 Report no. CTS 09-02
Active and Completed Research Projects
-
CSS Workshop and Advanced Flexibility in Design Curriculum, FY10
(12/2009) Status: Completed
-
System Analysis for Public Transit - Developing Data-Driven Support Tools for Transit Planning and Scheduling
(12/2009) Status: Completed
-
Research Implementation of the SMART-Signal System on TH13
(12/2009) Status: Completed
-
Risk Management Facilitation Workshop, FY 2010
(12/2009) Status: Completed
-
Accessible Traffic Signals for Blind and Visually Impaired Pedestrians
(11/2009) Status: Completed
-
Estimating and Measuring Arterial Travel Time and Delay
(11/2009) Status: Completed
-
Understanding Use of Non-Motorized Transportation Facilities - FY10 TechPlan
(11/2009) Status: Completed
-
Air Voids Testing for MnROAD Cells
(10/2009) Status: Completed
-
Personal Rapid Transportation Forum
(10/2009) Status: Completed
-
Development of Freeway Management and Operational Strategies with IRIS-In-LOOP Simulation
(10/2009) Status: Completed
-
Benefit-Cost Analysis of Value Pricing: Case Study for MnPass - FY10 TechPlan
(10/2009) Status: Completed
-
Toward Zero Deaths Conference, 2009-2010
(10/2009) Status: Completed
-
From Start to Finish: Cross-Sector Collaboration and the Urban Partnership Agreement - FY10 TechPlan
(10/2009) Status: Completed
-
Toward Zero Deaths Administration and Outreach, 2009-2010
(10/2009) Status: Completed
-
Implementing Distance-Based User Fees as a Replacement for the Fuel Tax - FY10 TechPlan
(10/2009) Status: Completed
-
Process Facilitation of Mn/DOT's Professional/Technical (P/T) Consultant Contracting Process
(09/2009) Status: Completed
-
An Evaluation of a Prototype Safe Teen Car
(09/2009) Status: Completed
-
How Affordable is Transportation? An Accessibility-Based Evaluation
(09/2009) Status: Completed
-
National Rural Road Safety Public Opinion Survey
(09/2009) Status: Completed
-
Design of a Framework for Measuring Sustainable Regional Development
(09/2009) Status: Completed
-
ITS and Locational Privacy: Suggestions for Peaceful Coexistance - FY10 TechPlan
(09/2009) Status: Completed
-
RUI: Self-sensing Concrete Pavement
(09/2009) Status: Completed
-
EMS System Data Integration to Improve Traffic Crash Emergency Response and Treatment - Phase III - FY10 TechPlan
(09/2009) Status: Completed
-
Vehicle Probe Based Real-time Traffic Monitoring on Urban Roadway Networks
(09/2009) Status: Completed
-
Maintenance and Enhancement for the National Rural Highway Safety Clearinghouse
(09/2009) Status: Completed
-
Innovative Parking Pricing Demonstration Project - Phase II
(08/2009) Status: Completed
-
Response Modification for Enhanced Operation and Safety of Bridges
(08/2009) Status: Completed
-
Performance Assessment of Oversized Culvert to Accommodate Fish Passage
(08/2009) Status: Completed
-
Aggregating VMT Within Predefined Geographic Zones Using a Cellular Network
(08/2009) Status: Completed
-
Optimizing the Supply Chain for Cost and Carbon Footprint
(08/2009) Status: Completed
-
Ultra Reliable Detection of Imminent Collision for Enhanced Passenger Safety
(08/2009) Status: Completed
-
Evaluation of Air Void Content in Asphalt Pavement through Ultrasonic Pulse-Echo Technology
(07/2009) Status: Completed
-
Mn/DOT Project Management Peer Review - Summer 2009
(07/2009) Status: Completed
-
Itasca County Area Transportation Study
(07/2009) Status: Completed
-
Trucks and SUVs in the Twin Cities Metropolitan Area: How Dangerous Are They?
(07/2009) Status: Completed
-
Workforce Planning for Transit Operations
(07/2009) Status: Completed
-
Full-Depth Precast Concrete Bridge Deck System Phase II
(07/2009) Status: Completed
-
TERRA , Fiscal Year 2010
(07/2009) Status: Completed
-
In-Vehicle Decision Support to Reduce Crashes at Rural Thru-Stop Intersections
(07/2009) Status: Completed
-
U.S. Corp of Army Engineers Construction Engineering Research Laboratory Bridge Health Monitoring
(07/2009) Status: Completed
-
Recycling Asphalt Roofing Shingles in Asphalt Pavements
(07/2009) Status: Completed
-
Optimal Contract Mechanism Design for Performance Based Contracts
(07/2009) Status: Completed
-
Portable, Non-Intrusive Advance Warning Devices for Work Zones With or Without Flag Operators
(07/2009) Status: Completed
-
Evaluation of Workforce Perceptions as a Means to Identify and Mitigate the Causes of Musculoskeletal Disorders
(07/2009) Status: Completed
-
Extraboard-Driver Workforce Planning for Bus Transit Operations
(07/2009) Status: Completed
-
Hospital Costs of SUVs and Light and Heavy Trucks to Themselves and Others
(07/2009) Status: Completed
-
RSS Report Publication Services, 2010
(07/2009) Status: Completed
-
Development of an Advanced Structural Monitoring System for Fracture Critical Steel Bridges
(06/2009) Status: Completed
-
Operational Research Program for Local Transportation Groups, 2010
(06/2009) Status: Completed
-
Convergence of Agriculture and Energy IV: Infrastructure Considerations for Biomass Harvest, Transportation and Storage
(06/2009) Status: Completed
-
Access to Destinations: Arterial Data Acquisition and Network-Wide Travel Time Estimation (Phase III)
(06/2009) Status: Completed
-
Intelligent Pavement for Traffic Flow Detection - Phase II - FY10 NATSRL
(06/2009) Status: Completed
-
Development of a New Tracking System based on CMOS Vision Processor Hardware: Phase II: Development and Demonstration of the Prototype Tracking System- FY10 NATSRL
(06/2009) Status: Completed
-
Development of a Portable Work Zone Traffic Information System with DSRC based V2I or V2V Communication and BT Cell Phones -FY10 NATSRL
(06/2009) Status: Completed
-
Snow Rendering for Interactive Snowplow Simulation: Improving Driver Ability to Avoid Collisions when Following a Snowplow - FY10 NATSRL
(06/2009) Status: Completed
-
Low-Cost Portable Video-Based Queue Detection for Work Zone Safety
(06/2009) Status: Completed
-
Cost Estimating Transition Support
(06/2009) Status: Completed
-
Improve the safety and efficiency of roadway maintenance phase I: Developing a robotic roadway message painter prototype - FY10 NATSRL
(06/2009) Status: Completed
-
Linking Transportation Initiatives with Urban Design Options: The University-Cedar Avenue Station
(06/2009) Status: Completed
-
Speed Impacts of Occasional Hazard Residential Street Warning Sign
(06/2009) Status: Completed
-
Mechanistic Modeling of Unbonded Concrete Overlays
(06/2009) Status: Completed
-
Mn/DOT Cost Estimation and Cost Management Training Delivery
(06/2009) Status: Completed
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy (Phase III) - FY10 NATSRL
(06/2009) Status: Completed
-
Structural Evaluation of Asphalt Pavements with Full-Depth Reclaimed Base
(06/2009) Status: Completed
-
Development of Hydrogen Based Power Systems for ITS Applications - FY10 NATSRL
(06/2009) Status: Completed
-
Research and Assess the Farmer and Mn/DOT Economic and Environmental Costs and Benefits of Living Snow Fences Including Carbon Impacts
(06/2009) Status: Completed
-
Economic Impact of Airports & Update Economic Impact Calculator
(06/2009) Status: Completed
-
Wakota Bridge Monitoring Program
(06/2009) Status: Completed
-
Advancing Public Interest in Public-Private Partnerships of State Highway Development
(06/2009) Status: Completed
-
Addressing Climate Change in State and Local Environmental Review Policies
(06/2009) Status: Completed
-
New Jersey Transit DBE Goals Report to the Federal Transit Authority
(05/2009) Status: Completed
-
Minnesota Horizontal Curve Safety Improvement Project
(05/2009) Status: Completed
-
Mn/DOT Project Management for Advanced Skills and Critical Issues Training, FY09
(04/2009) Status: Completed
-
Transitway Data Management Project
(04/2009) Status: Completed
-
Analysis of the Impact of Road Use for Alternate Transportation in Denali Park
(04/2009) Status: Completed
-
History of Minnesota Highways, Phase II
(04/2009) Status: Completed
-
Mn/DOT Symposium on Transportation Long-Range Solution
(04/2009) Status: Completed
-
Value-added: Impacts of the Proximity to Transitway Stations on Commercial Property Values
(04/2009) Status: Completed
-
Tilling and Composting Compacted Soils to Decrease Urban Runoff
(04/2009) Status: Completed
-
Urban Stormwater Inputs of Perfluorochemicals
(04/2009) Status: Completed
-
Study of Public Acceptance of Tolling Credits
(04/2009) Status: Completed
-
Thermochemical Fuels: Solar at Night
(04/2009) Status: Completed
-
Using Archived Truck GPS Data for Freight Performance Analysis on Interstate I-94/I-90 from the Twin Cities to Chicago
(04/2009) Status: Completed
-
Transportation Funding and Finance Summit
(04/2009) Status: Completed
-
Highway Cost Allocation and Determination of Heavy Freight-Truck Permit Fees
(03/2009) Status: Completed
-
Low Carbon Logistics through Supply Chain Design and Coordinations
(03/2009) Status: Completed
-
Performance of Pervious Concrete Pavement in a Cold Weather Climate
(03/2009) Status: Completed
-
Migration of ATR and Short-Duration Traffic Data Warehouse at UMD Data Center to Mn/DOT TDA
(03/2009) Status: Completed
-
Comparison of Dual-Phase and Static Signage
(02/2009) Status: Completed
-
Toward Zero Deaths Regional Workshops, 2009
(02/2009) Status: Completed
-
2009 Environmental Stewardship and Streamlining Workshop
(02/2009) Status: Completed
-
Monitoring Instrumentation of I35W Bridge
(02/2009) Status: Completed
-
Rural Intersection Collision Avoidance System (RICAS) Design, Integration and Project Management Services
(02/2009) Status: Completed
-
Near-Term-Implementable Mechanisms for Collecting Road User Charges Based on Vehicle-Miles Traveled
(02/2009) Status: Completed
-
Minnesota Low Carbon Fuels Study
(01/2009) Status: Completed
-
Assessment of Centerline Rumble Strips in Minnesota
(01/2009) Status: Completed
-
SMART-SIGNAL: Systematic Monitoring of Arterial Road Traffic and Signals-Phase 2
(01/2009) Status: Completed
-
Mn/DOT Flexibility in Design Forum - Winter/Spring 2009
(01/2009) Status: Completed
-
Air Pollution Emissions from Conventional and Alternative Transportation Fuels
(01/2009) Status: Completed