-
Load Rating Assessment of Three Slab-Span Bridges Over Shingle Creek
August 2022,
Report no. MnDOT 2022-29
-
Appendices for: Development of Cost-Competitive Timber Bridge Designs for Long-Term Performance
June 2020,
Report no. MnDOT 2020-16A
-
Development of Cost-Competitive Timber Bridge Designs for Long-Term Performance
June 2020,
Report no. MnDOT 2020-16
-
Ten-Year Review of Monitoring System on I-35W Saint Anthony Falls Bridge
June 2020,
Report no. MnDOT 2020-19
-
Debonded Strands in Prestressed Concrete Bridge Girders
July 2019,
Report no. MnDOT 2019-30
-
Deterioration of Mixed Rebar and Fiber-Reinforced Concrete Bridge Decks
February 2019,
Report no. MnDOT 2019-09
-
Anchorage of Epoxy-Coated Rebar Using Chemical Adhesives
February 2019,
Report no. MnDOT 2019-07
-
Displacement Monitoring of I-35W Saint Anthony Falls Bridge with Current Vibration-Based System
January 2019,
Report no. MnDOT 2019-05
-
BR27568 - Experimental Shear Capacity Comparison Between Repaired and Unrepaired Girder Ends
February 2018,
Report no. MnDOT 2018-07
-
Feasibility of Vibration-Based Long-Term Bridge Monitoring Using the I-35W St. Anthony Falls Bridge
January 2017,
Report no. MnDOT 2017-01
-
Investigation of Shear Distribution Factors in Prestressed Concrete Girder Bridges
September 2016,
Report no. MnDOT 2016-32
-
Three-Dimensional Simulation of Bridge Foundation Scour on Mississippi River Bridges 9321 & 27801
February 2016,
Report no. CTS 16-03
-
Effect of Temperature on Prestressed Concrete Bridge Girder Strand Stress During Fabrication
December 2015,
Report no. MnDOT 2015-50
-
Protocols and Criteria for Acoustic Emission Monitoring of Fracture-Critical Steel Bridges
June 2015,
Report no. MnDOT 2015-36
-
Matrix (Partially Grouted) Riprap Lab Flume Study
April 2015,
Report no. MnDOT 2015-15
-
Development and Integration of Advanced Timber Bridge Inspection Techniques for NBIS
January 2015,
Report no. MnDOT 2015-01
-
Modeling and Monitoring the Long-Term Behavior of Post-Tensioned Concrete Bridges
November 2014,
Report no. MnDOT 2014-39
-
Anchorage of Shear Reinforcement in Prestressed Concrete Bridge Girders
October 2014,
Report no. MnDOT 2014-36
-
Scour Monitoring Technology Implementation
August 2014,
Report no. MnDOT 2014-37
-
Acoustic Emission Monitoring of a Fracture-Critical Bridge
March 2014,
Report no. MnDOT 2014-15
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy, Phases III
and IV: Continued Field Testing and Refinement of Novel Water and Ice Sensor Systems on Bridge Decks
August 2013,
Report no. CTS 13-26
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy Phase II
August 2013,
Report no. CTS 13-25
-
Wakota Bridge Thermal Monitoring Program
Part I: Analysis and Monitoring Plan
May 2013,
Report no. MnDOT 2013-11
-
Wakota Bridge Thermal Monitoring Program
Part II: Data Analysis and Model Comparison
May 2013,
Report no. MnDOT 2013-12
-
Full-Depth Precast Concrete Bridge Deck System: Phase II
October 2012,
Report no. MnDOT 2012-30
-
Instrumentation, Monitoring, and Modeling of the I-35W Bridge
August 2012,
Report no. MnDOT 2012-24
-
Validation of Prestressed Concrete I-Beam Deflection and Camber Estimates
June 2012,
Report no. MnDOT 2012-16
-
Enhancing Bridge Safety and Operation with
Response Modification (Research Brief)
June 2012,
Report no. CTS Research Brief 2012-04
-
Development of Best Practices for Inspection of PT Bridges in Minnesota
April 2012,
Report no. MnDOT 2012-09
-
Scaling of Static Fracture of Quasibrittle Structures: Strength, Lifetime and Fracture Kinetics
February 2012,
Report no. 10.1115/1.4005881
-
Innovative Technologies for Lifetime Extension of an Aging Inventory of Vulnerable Bridges
December 2011,
Report no. CTS 11-27
-
Response Modification for Enhanced Operation and Safety of Bridges
August 2011,
Report no. CTS 11-14
-
Development of an Advanced Structural Monitoring System
November 2010,
Report no. MnDOT 2010-39
-
Bridge Scour Monitoring Technologies: Development of
Evaluation and Selection Protocols for Application on River
Bridges in Minnesota
March 2010,
Report no. Mn/DOT 2010-14
-
Evaluation of the SafeLaneTM Overlay System for Crash Reduction on Bridge Deck Surfaces
March 2010,
Report no. Mn/DOT 2010-13
-
Discrepancies in Shear Strength of Prestressed Beams with
Different Specifications
January 2010,
Report no. Mn/DOT 2010-03
-
Development of Flexural Vibration Inspection Techniques to
Rapidly Assess the Structural Health of Rural Bridge Systems:
Phase II
December 2009,
Report no. MnDOT 2009-40
-
A Computational Study of the I-35W Bridge Collapse
October 2009,
Report no. CTS 09-29
-
Bridge Health Monitoring and Inspections - A Survey of
Methods
September 2009,
Report no. Mn/DOT 2009-29
-
Incorporation of Fatigue Detail Classification of Steel Bridges into the Mn/DOT Database
April 2009,
Report no. 200722TS
-
Putting Research into Practice: Implementing a Fatigue Detail Classification Scheme for Mn/DOT's Steel Bridges
April 2009,
Report no. 2007084TS
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy Phase I
April 2009,
Report no. CTS 09-12
-
Crack and Concrete Deck Sealant Performance
March 2009,
Report no. Mn/DOT 2009-13
-
Impending Box Impact Warning System for Prevention of Snowplow-Bridge Impacts: A Final Report of Investigations
February 2009,
Report no. CTS 09-08
-
Self-Compacting Concrete (SCC) for Prestressed Bridge Girders
October 2008,
Report no. MnDOT 2008-51
-
Monitoring and Analysis of MnDOT Precast Composite Slab Span System (PCSSS)
September 2008,
Report no. MnDOT 2008-41
-
Development of Flexural Vibration Inspection Techniques to Rapidly Assess the Structural Health of Rural Bridge Systems
September 2008,
Report no. CTS 08-22
-
TH 241 Column-Supported Embankment
June 2008,
Report no. CTS 08-11
-
Shear Capacity of Prestressed Concrete Beams
November 2007,
Report no. MnDOT 2007-47
-
Modeling Issues Associated with Sensor Technologies for the Nondestructive Evaluation of Timber Bridges
August 2007,
Report no. CTS 07-04
-
Incorporation of Fatigue Detail Classification of Steel Bridges into the Minnesota Department of Transportation Database
June 2007,
Report no. Mn/DOT 2007-22
-
Determining Economic Strategies for Repair and Replacement of Low Slump Overlays of Bridge Decks
May 2007,
Report no. MnDOT 2007-14
-
Strength and Stability of Prestressed Concrete Through-Girder Pedestrian Bridges Subjected to Vehicular Impact
January 2007,
Report no. MnDOT 2007-08
-
Load Rating of Composite Steel Curved I-Girder Bridges Through Load Testing with Heavy Trucks
October 2006,
Report no. MnDOT 2006-40
-
Application of Precast Decks and Other Elements to Bridge Structures
September 2006,
Report no. MnDOT 2006-37
-
Fatigue-Resistant Design for Overhead Signs, Mast-Arm Signal Poles, and Lighting Standards
March 2006,
Report no. Mn/DOT 2006-07
-
Use of Adhesives to Retrofit Out-of-Plane Distortion Induced
Fatigue Cracks
February 2006,
Report no. MnDOT 2006-04
-
Investigation of Deterioration of Stainless Steel Dowel Tubes Under Repeated Loading
December 2005,
Report no. MnDOT 2006-01
-
Analysis of Girder Differential Deflection and Web Gap Stress for Rapid Assessment of Distortional Fatigue Stress in Multi-Girder Steel Bridges
October 2005,
Report no. MnDOT 2005-38
-
Retrofitting Shear Cracks in Reinforced Concrete Pier Caps Using Carbon Fiber Reinforced Polymers
April 2005,
Report no. MnDOT 2005-13
-
Behavior of Concrete Integral Abutment Bridges
November 2004,
Report no. Mn/DOT 2004-43
-
Fatigue Evaluation of Steel Box-Girder Pier Caps: Bridge 69832
March 2004,
Report no. MnDOT 2003-18
-
Repair of Fatigued Steel Bridge Girders with Carbon Fiber Strips
December 2003,
Report no. MnDOT 2004-02
-
Rapid Assessment of Distortional Stresses in Multi-Girder Steel Bridges
June 2003,
Report no. MnDOT 2004-48
-
Effects of Increasing Truck Weight on Steel & Prestressed Bridges
March 2003,
Report no. MnDOT 2003-16
-
The Effect of Transverse Stiffener Beams on Shear Transfer
January 2003,
Report no. Mn/DOT 2003-12
-
Effect of Vertical Pre-Release Cracks on Prestressed Bridge Girders
October 2002,
Report no. MnDOT 2003-33
-
Inspection of Timber Bridges
September 2002,
Report no. Mn/DOT 2002-34
-
Evaluation of Retrofit Procedures for Nail-Laminated and Stringer Bridges
March 2002,
Report no. Mn/DOT 2002-28
-
Analysis Tools and Rapid Screening Data for Distortional Fatigue in Steel Bridge Girders
November 2001,
Report no. MnDOT 2002-06
-
Live Load Stresses in Steel Curved Girder Bridges
September 2001,
Report no. Mn/DOT 2002-08
-
Fatigue Evaluation of the Deck Truss of Bridge 9340
March 2001,
Report no. MnDOT 2001-10
-
High-Strength Concrete Prestressed Bridge Girders: Long Term and Flexural Behavior
November 2000,
Report no. MnDOT 2000-32
-
Development Length of GFRP Reinforcement in Concrete Bridge Decks
July 2000,
Report no. MnDOT 2000-26
-
Evaluation of Electrochemical Chloride Extraction (ECE) and Fiber Reinforced Polymer (FRP) Wrap Technology
June 2000,
Report no. MnDOT 2000-24
-
Fatigue of Stud Shear Connectors in the Negative Moment Region of Steel Girder Bridges
June 2000,
Report no. CTS 00-03
-
Distortion-Induced Fatigue in Multi-Girder Steel Bridges
May 2000,
Report no. MnDOT 2000-16
-
Effects of Pre-Release Cracks in High-Strength Prestressed Girders
January 2000,
Report no. MnDOT 2000-25
-
Acoustic Emission Monitoring of Fatigue Cracks in Steel Bridge Girders
September 1999,
Report no. MnDOT 1999-36
-
Acoustic Emission Equipment for Infrastructure Monitoring
January 1999,
Report no. MnDOT 1999-18
-
Stability of Pile Groups
January 1999,
Report no. MnDOT 1999-31
-
Transverse Cracking in Concrete Bridge Decks
January 1999,
Report no. MnDOT 1999-05
-
Moisture Content Variations of Nail-Laminated Timber Bridges in a Northern Climate
November 1998,
Report no. Mn/DOT 1999-03
-
Monitoring and Assessment Program for Wabasha County Bridge
September 1998,
Report no. MnDOT 1998-22
-
Shear Capacity of High-Strength Concrete Prestressed Girders
September 1998,
Report no. MnDOT 1998-12
-
Mechanical Properties of High-Strength Concrete
September 1998,
Report no. MnDOT 1998-11
-
A Camber Study of Mn/DOT Prestressed Concrete I-Girders
August 1998,
Report no. MnDOT 1998-08
-
Instrumentation and fabrication of two high strength concrete prestressed bridge girders
August 1998,
Report no. MnDOT 1998-09
-
Freeze-thaw durability of high strength concrete
August 1998,
Report no. MnDOT 1998-10
-
Release Methodology of Prestressing Strands
May 1998,
Report no. MnDOT 2000-09
-
Cold temperature effects on stress laminated bridge decks
December 1997,
Report no. Mn/DOT 1998-03
-
Design Issues Related to Road Tunnels
December 1997,
Report no. CTS 97-05
-
Relationship Between Timber Bridge Characteristics and Asphalt Pavement Wear Surface Performance: Summary
June 1997,
Report no. Mn/DOT 1998-07S
-
Stresses in steel curved girder bridges
August 1996,
Report no. MnDOT 1996-28
-
Retrofit of wood bridges : final report
February 1993,
Report no. Mn/DOT 1994-16
-
Field instrumentation of steel highway bridges
February 1993,
Report no. Mn/DOT 1994-15
-
Reusability and Impact Damage Repair of Twenty-Year-Old AASHTO Type III Girders
January 1992,
Report no. BCS-8451536
-
Development of Non-Proprietary Ultra-High Performance Concrete (UHPC) Prestressed Bridge Girders
(09/2024),
Status: Active
-
Species from Feces: A New Tool to Identify Bats in Culverts and on Bridges
(08/2024),
Status: Active
-
Potential Impacts of Climate Change on Thermally Induced Loading in Minnesota Bridges
(06/2024),
Status: Active
-
Understanding Causes of Concrete Culvert Pipe Joint Separation
(09/2023),
Status: Active
-
Ice Loading on Piers for Minnesota's Bridges
(07/2023),
Status: Active
-
Deck Reinforcement Detailing and Concrete Mix Additives to Reduce Bridge Deck Cracking
(07/2023),
Status: Active
-
Performance Evaluation of Reinforced Concrete Box Culverts
(10/2022),
Status: Active
-
Steel Pipe Standards
(12/2021),
Status: Completed
-
Evaluation of Corrugated HDPE Pipes Manufactured with Recycled Content
(08/2021),
Status: Active
-
Load Rating Assessment of Three Slab-Span Bridges over Shingle Creek
(06/2020),
Status: Completed
-
Implementation of Culvert Design Guide for Stream Connectivity and Aquatic Organism Passage (AOP)
(10/2019),
Status: Completed
-
10 Year Review of Monitoring System on I-35W Saint Anthony Falls Bridge
(04/2018),
Status: Completed
-
Debonded prestressed strand in prestressed beams
(12/2017),
Status: Completed
-
Bridge Deck Performance
(11/2017),
Status: Completed
-
Anchorage of epoxy-coated rebar using chemical adhesives
(11/2017),
Status: Completed
-
Remaining Service Life Asset Measure, Phase 1
(06/2017),
Status: Completed
-
Experimental Shear Capacity Comparison Between Repaired and Unrepaired Girder Ends
(03/2017),
Status: Completed
-
Displacement Monitoring of I35W Bridge with Current VibrationBased System
(06/2016),
Status: Completed
-
Enriched Sensor Data for Enhanced Bridge Weigh-in-Motion (eBWIM) Applications
(05/2016),
Status: Completed
-
Cost-competitive Timber Bridge Designs for Long Term Performance
(12/2015),
Status: Completed
-
Feasibility of vibration-based long-term bridge monitoring using I35W St. Anthony Falls Bridge
(09/2015),
Status: Completed
-
Hydraulic Power Supply for the Mechanical Testing of Resilient and Sustainable Structures, Pavements, Geomaterials, and Medical Devices
(07/2015),
Status: Completed
-
Integration of Advanced Timber Bridge Inspection Techniques
(01/2015),
Status: Completed
-
High Fidelity Simulation of Bridge Foundation Scour at the Mississippi River Bridge, Bridge No. 9321
(04/2014),
Status: Completed
-
Effect of Temperature on Prestressed Concrete Bridge Girder Strand Stress During Fabrication
(06/2013),
Status: Completed
-
Development and Integration of Advanced Timber Bridge Inspection Techniques for NBIS
(08/2012),
Status: Completed
-
Anchorage of Shear Reinforcement in Prestressed Concrete Bridge Girders
(06/2012),
Status: Completed
-
Monitoring of Fracture Critical Steel Bridges - Phase III
(06/2012),
Status: Completed
-
Time-Dependent Considerations of I35W St. Anthony Falls Bridge Including Long-Term Monitoring Applications
(06/2012),
Status: Completed
-
Matrix (Partially Grouted) Riprap Lab Flume Study
(11/2011),
Status: Completed
-
Investigation of Shear Distribution Factors in Prestressed Concrete Girder Bridges
(09/2011),
Status: Completed
-
Continued Field Testing and Refinement of Novel Water and Ice Sensor Systems on Bridge Decks - FY12 NATSRL
(07/2011),
Status: Completed
-
Size- and Shape-Effects on Safety Factors of Quasibrittle Structures
(06/2011),
Status: Completed
-
Scour Monitoring Technology Implementation
(04/2011),
Status: Completed
-
Innovative Technologies for Lifetime Extension of an Aging Inventory of Vulnerable Bridges
(02/2011),
Status: Completed
-
Assessment of the Health of Structural Systems via Laser-Enabled Agile Sensing
(02/2011),
Status: Completed
-
Development of an Advanced Warning System for Fracture Critical Steel Bridges - Phase II
(09/2010),
Status: Completed
-
Deployment and Field Testing of Novel Water and Ice Sensor Systems on Bridge Decks - FY11 NATSRL
(07/2010),
Status: Completed
-
Comparative Performance Study of Chip Seal and Bonded Wear Course Systems Applied to Bridge Decks and Approaches
(07/2010),
Status: Completed
-
Inspection of In-Place Bridges Constructed with Grouted Post-Tensioning Ducts
(07/2010),
Status: Completed
-
Traffic Impacts of Bridge Closures 2: Saint Croix Bridge
(07/2010),
Status: Completed
-
Validation of Prestressed Concrete I-Beam Deflection and Camber Estimates
(05/2010),
Status: Completed
-
Traffic Impacts of Bridge Closures 1: Lafayette Bridge
(04/2010),
Status: Completed
-
Response Modification for Enhanced Operation and Safety of Bridges
(08/2009),
Status: Completed
-
Full-Depth Precast Concrete Bridge Deck System Phase II
(07/2009),
Status: Completed
-
U.S. Corp of Army Engineers Construction Engineering Research Laboratory Bridge Health Monitoring
(07/2009),
Status: Completed
-
Development of an Advanced Structural Monitoring System for Fracture Critical Steel Bridges
(06/2009),
Status: Completed
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy (Phase III) - FY10 NATSRL
(06/2009),
Status: Completed
-
Wakota Bridge Monitoring Program
(06/2009),
Status: Completed
-
Monitoring Instrumentation of I35W Bridge
(02/2009),
Status: Completed
-
Bridge scour monitoring technologies: Development of evaluation and selection protocols for application on river bridges in Minnesota
(09/2008),
Status: Completed
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy (Phase II) - FY09 NATSRL
(07/2008),
Status: Completed
-
Bridge Health Monitoring- A Survey of Methods
(03/2008),
Status: Completed
-
Implementing a Database Classification of Mn/DOT Steel Bridges with Fracture/Fatigue Critical Details
(03/2008),
Status: Completed
-
Evaluation of the SafeLaneTM Overlay System for Crash Reduction on Bridge Deck Surfaces
(03/2008),
Status: Completed
-
A Computational Study of the I-35W Bridge Collapse
(01/2008),
Status: Completed
-
SGER: Responding to the Unexpected: Understanding Travelers' Behavioral Choices in the Wake of the MS River Bridge Collapse
(09/2007),
Status: Completed
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy (Phase I) - FY08 NATSRL
(06/2007),
Status: Completed
-
Discrepancies in Shear Strength of Prestressed Beams with Different Specifications
(09/2006),
Status: Completed
-
Crack and Concrete Deck Sealant Performance
(09/2006),
Status: Completed
-
Development of Flexural Vibration Inspection Equipment and Techniques to Rapidly Assess the Structural Health of Rural Bridge Systems; Phase II
(09/2006),
Status: Completed
-
NCHRP Project 10-71 Cast-in-Place Concrete Connections for Precast Deck Systems
(07/2006),
Status: Completed
-
Impending Box Impact Warning System for Prevention of Snowplow-Bridge Impacts - FY07 NATSRL
(07/2006),
Status: Completed
-
Instrumentation of a Full Depth Precast Concrete Bridge Deck System
(09/2005),
Status: Completed
-
Monitoring and Analysis of a Full Depth Precast Concrete Bridge Deck
(08/2005),
Status: Completed
-
Evaluation and Analysis of Mn/DOT Steel Bridge Inventory for Prioritizing Bridge Maintenance Needs
(08/2005),
Status: Completed
-
Application of Precast Decks and other Elements to Bridge Structures
(11/2004),
Status: Completed
-
Determining Shear Capacity of Prestressed Concrete Beams
(11/2004),
Status: Completed
-
Determining Economic Strategies for Repair and Replacement of Low Slump Overlays of Bridge Decks
(08/2004),
Status: Completed
-
Investigation of Deterioration of Stainless Steel Dowel Tubes Under Repeated Loading
(08/2004),
Status: Completed
-
Development of Flexural Vibration Inspection Techniques to Rapidly Assess the Structural Health of Rural Bridge Systems - FY05 NATSRL
(07/2004),
Status: Completed
-
Modeling Issues Associated with Sensor Technologies for the Nondestructive Evaluation of Timber Bridges - FY05 NATSRL
(07/2004),
Status: Completed
-
Rapid Assessment and Decision Making Strategies for Distortional Fatigue Multi-Girder Steel Bridges - Phase 4
(07/2004),
Status: Completed
-
Self-Compacting Concrete (SCC) for Prestressed Bridge Girders
(09/2003),
Status: Completed
-
Stability Tests of Prestressed Concrete Through-Girder Pedestrian Bridge under Lateral Impact - Phase 2
(06/2003),
Status: Completed
-
Fatigue-resistant Design Details for Overhead Signs, Mast-arm Signal Poles and Lighting Standards
(04/2003),
Status: Completed
-
Load Rating by Load Testing on Bridges
(01/2003),
Status: Completed
-
Stability Analysis of Prestressed Concrete Through Girder Pedestrian Bridge Under Lateral Impact - Phase I
(01/2002),
Status: Completed
-
Rapid Assessment and Decision Making Strategies for Distortional Fatigue Multi-Girder Steel Bridges
(09/2001),
Status: Completed
-
Fatigue Evaluation of Bridge 69832
(09/2001),
Status: Completed
-
Behavior of Concrete Integral Abutments
(02/2001),
Status: Completed
-
Analysis Tools and Rapid Screening Data for Distortional Fatigue in Steel Bridge Girders
(08/2000),
Status: Completed
-
Use of FRP Sheets to Retrofit (Strengthen) Pier Caps
(01/2000),
Status: Completed
-
Experimental Investigation of the Effect of Vertical Pre-Release Cracks in Prestressed Bridge Girders
(12/1999),
Status: Completed
-
Effects of Increasing Truck Weight on Steel and Prestressed Bridges
(12/1999),
Status: Completed
-
Use of Adhesives to Repair out of Plane Bending at Stiffener to Web Connections
(11/1999),
Status: Completed
-
Fatigue Assessment of Deck Truss of Bridge 9340 TH I35W over the Mississippi River
(05/1999),
Status: Completed
-
Repair of Fatigued Steel Bridge Girders with Carbon Fiber Strips
(01/1999),
Status: Completed
-
Stresses in the Negative Moment Region of Composite Steel Bridges
(09/1998),
Status: Completed
-
Remote Monitoring of Distortional Fatigue in Multi-Girder Steel Bridges
(07/1998),
Status: Completed
-
Effect of Pre-release Cracks on Prestressed Bridge Girder Performance including Remaining Fatigue Life
(06/1998),
Status: Completed
-
Fatigue Evaluation of Bridge 4654
(06/1998),
Status: Completed
-
Transverse Stiffener Beams in Longitudinally Nail Laminated Timber Decks
(11/1997),
Status: Completed
-
Equilibrium Moisture Content of Wood in Minnesota Timber Bridges
(10/1997),
Status: Completed
-
Evaluation of Electrochemical Chloride Extraction
(08/1997),
Status: Completed
-
Acoustic Emission Monitoring of Fatigue Cracks in Steel Bridge Girders
(06/1997),
Status: Completed
-
Development Length of GFRP Reinforcement in Concrete Bridge Decks
(02/1997),
Status: Completed
-
Live Load Stresses in Steel Curved Girder Bridges
(02/1997),
Status: Completed
-
Monitoring and Assessment Program for Wabasha County Bridge
(09/1996),
Status: Completed
-
Stability of Pile Groups
(09/1996),
Status: Completed
-
Assessing Failure with Acoustic Emissions
(08/1996),
Status: Completed
-
Evaluation of Timber Bridge Wear Surfaces
(06/1996),
Status: Completed
-
Acoustic Emission Equipment for Infrastructure Monitoring
(01/1996),
Status: Completed
-
Evaluation of Retrofit Procedures for Nail-Laminated and Stringer Bridges
(06/1995),
Status: Completed
-
Field Performance of an Integral Abutment Bridge
(06/1995),
Status: Completed
-
Repair of Metal Culverts - Phase 2
(06/1995),
Status: Completed
-
Release Methodology of Prestressed Strands
(11/1994),
Status: Completed
-
Cracking in Concrete Bridge Decks
(11/1994),
Status: Completed
-
Repair of Metal Culverts, Phase 1
(10/1994),
Status: Completed
-
Stresses in Steel Curved Girder Bridges
(08/1994),
Status: Completed
-
Use of Non-Metallic Reinforcement in Concrete Structures
(07/1994),
Status: Completed
-
High Strength Concrete: Applications to Bridges
(03/1992),
Status: Completed