2013
Research Reports
| Active and Completed Projects
Research Reports
-
Complete Streets from Policy to Project The Planning and Implementation of Complete Streets at Multiple Scales
December 2013 Report no. MnDOT 2013-30
-
Performance-Based Measurement of Optimum Moisture
for Soil Compaction
November 2013 Report no. MnDOT 2013-28
-
Implementation of Pavement Evaluation Tools
November 2013 Report no. MnDOT 2013-29
-
Friction Measurement System for Polk County
November 2013 Report no. MnDOT 2013-26
-
Improved Approach to Enforcement of Road Weight Restrictions
November 2013 Report no. MnDOT 2013-27
-
The Minnesota Bicycle and Pedestrian Counting Initiative: Methodologies for Non-motorized Traffic Monitoring
October 2013 Report no. MnDOT 2013-24
-
A Fast, Auction-Based Algorithm for Paratransit Vehicle Assignment
September 2013 Report no. CTS 13-28
-
Effectiveness of Urban Partnership Agreement Traffic Operations
Measures in the I-35W Corridor
August 2013 Report no. CTS 13-22
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy Phase II
August 2013 Report no. CTS 13-25
-
Video Detection and Classification of Pedestrian Events at
Roundabouts and Crosswalks
August 2013 Report no. CTS 13-27
-
Achieving System-Level, Transit-Oriented Jobs-Housing
Balance: Perspectives of Twin Cities Developers and Business
Leaders
August 2013 Report no. CTS 13-24
-
Spurring Private-Sector Development Along Transit Corridors (Research Brief)
August 2013 Report no. CTS Research Brief 2013-02
-
Detection of Water and Ice on Bridge Structures by AC Impedance and Dielectric Relaxation Spectroscopy, Phases III
and IV: Continued Field Testing and Refinement of Novel Water and Ice Sensor Systems on Bridge Decks
August 2013 Report no. CTS 13-26
-
Bike, Bus, and Beyond: Extending Cyclopath to Enable Multi-
Modal Routing
July 2013 Report no. MnDOT 2013-19
-
A Pilot Study on Mitigating Run-Off-Road Crashes
July 2013 Report no. CTS 13-23
-
Improving Traffic Signal Operations for Integrated Corridor
Management
July 2013 Report no. MnDOT 2013-17
-
Wakota Bridge Thermal Monitoring Program
Part I: Analysis and Monitoring Plan
May 2013 Report no. MnDOT 2013-11
-
Wakota Bridge Thermal Monitoring Program
Part II: Data Analysis and Model Comparison
May 2013 Report no. MnDOT 2013-12
-
Mitigating Highway Construction Impacts Through the Use of
Transit
May 2013 Report no. MnDOT 2013-13
-
A Prototype System for Chemical Hydrogen Generation and Storage for Operating ITS Devices
April 2013 Report no. CTS 13-11
-
SMART-Signal Phase II: Arterial Offset Optimization Using Archived High-Resolution Traffic Signal Data
April 2013 Report no. CTS 13-19
-
Access Across America: Auto 2013
April 2013 Report no. CTS 13-20
-
Improving Freeway Traffic Speed Estimation Using High-Resolution Loop Detector Data
April 2013 Report no. CTS 13-21
-
Ridership and Pedestrian Impacts of Transitways: A Case Study of Hiawatha Light-Rail Transit in Minneapolis (Research Brief)
March 2013 Report no. CTS Research Brief 2013-01
-
Feasibility of Using GPS to Track Bicycle Lane Positioning
March 2013 Report no. CTS 13-16
-
Development of an Innovative Prototype Lane Departure Warning System
March 2013 Report no. CTS 13-14
-
Developing an Intelligent Decision Support System for the Proactive Implementation of Traffic Safety Strategies
March 2013 Report no. CTS 13-12
-
Hand Images in Virtual Spatial Collaboration for Traffic
Incident and Disaster Management
March 2013 Report no. CTS 13-15
-
Transportation Impact of Transitways: A Case Study of Hiawatha
Light Rail Transit in Minneapolis
March 2013 Report no. CTS 13-13
-
Transport of Perfluorochemicals to Surface and Subsurface Soils
March 2013 Report no. CTS 13-17
-
Improving the Safety and Efficiency of Roadway Maintenance Phase II: Developing a Vision Guidance System for the Robotic Roadway Message Painter
February 2013 Report no. CTS 13-09
-
Development of a Multiple-Camera Tracking System for Accurate Traffic Performance Measurements at Intersections
February 2013 Report no. CTS 13-10
-
Research Implementation of the SMART SIGNAL System on Trunk
Highway (TH) 13
February 2013 Report no. MnDOT 2013-06
-
Development of Hybrid DSRC-PCMS Information Systems for Snowplow Operations and Work Zones
February 2013 Report no. CTS 13-08
-
Understanding the Economic Effects of Flexibility through
Three Employer Case Studies
February 2013 Report no. MnDOT 2013-07
-
Thermal Image-Based Deer Detection to Reduce Accidents Due to Deer-Vehicle Collisions
January 2013 Report no. CTS 13-06
-
Using Detailed Signal and Detector Data to Investigate Intersection Crash Causation
January 2013 Report no. CTS 13-05
-
Quality of Life: Assessment for Transportation Performance Measures
January 2013 Report no. MnDOT 2013-05
-
Design and Construction Guidelines for Thermally Insulated
Concrete Pavements
January 2013 Report no. MnDOT 2013-02
-
Monitoring the Use of HOV and HOT Lanes
January 2013 Report no. CTS 13-07
-
Case Studies of Transportation Investment to Identify the
Impacts on the Local and State Economy
January 2013 Report no. MnDOT 2013-03
-
Snow Rendering for Interactive Snowplow Simulation - Supporting Safety in Snowplow Design (January 2013)
January 2013 Report no. CTS 13-02
-
Instrumentation of Navistar Truck for Data Collection
January 2013 Report no. MnDOT 2013-01
-
Friction Measurement System for Hennepin County
January 2013 Report no. CTS 13-03T
-
Bus Driver Intersection Task Analysis: Investigation of Bus-Pedestrian Crashes
January 2013 Report no. CTS 13-04
-
Analysis of Single Frequency, Carrier Phase Based GPS Positioning Performance and Sensor Aiding Requirements
January 2013 Report no. CTS 13-01
Active and Completed Research Projects
-
Minnesota Council on Transportation Access Support, FY 14
(12/2013) Status: Completed
-
Truck Weight Compliance Education and Outreach Program 2014-2016
(12/2013) Status: Completed
-
Evaluation, Development and Implementation of 3D Ground Penetrating Radar for Assessment of Minnesota Infrastructure
(12/2013) Status: Completed
-
Impact of Exempting Low-Level Speed Violations
(11/2013) Status: Completed
-
Accessibility Observatory
(11/2013) Status: Completed
-
Preliminary Highway Design, Geometric and Alternate Intersection Workshops, FY 14
(10/2013) Status: Completed
-
Reserve Driver Online Scheduling
(10/2013) Status: Completed
-
Toward Zero Deaths Administration and Outreach 2013-2014
(10/2013) Status: Completed
-
Context-Sensitive Solutions Advanced Flexibility in Design and Complete Streets, FY 14
(10/2013) Status: Completed
-
Implementation of Traffic Data Quality Verification for Weigh-in-Motion Sites
(10/2013) Status: Completed
-
2014-2015 Toward Zero Deaths Regional Support
(09/2013) Status: Completed
-
2013-2014 Toward Zero Deaths Conference
(09/2013) Status: Completed
-
Comprehensive Field Evaluation of Asphalt Patching Techniques and Development of Best Practices Manual and Simple Decision Tree
(09/2013) Status: Completed
-
Evaluation of the Effectiveness of ATM Messages Used During Incidents
(09/2013) Status: Completed
-
Enhancement and Application of Minnesota Dry Swale Calculator
(09/2013) Status: Completed
-
Human Services Research and Transportation Planning
(09/2013) Status: Completed
-
Develop Annual Arterial Congestion Report
(08/2013) Status: Completed
-
I-35E MnPASS Extenstion Land Use and Transit Enhancement Study
(08/2013) Status: Completed
-
Fiscal Year 2014 Administrative Support for the Minnesota Freight Advisory Committee
(08/2013) Status: Completed
-
Culvert Design, Installation and Maintenance Independent On-Line Distance Learning Course
(08/2013) Status: Completed
-
Local Road Research Board Gravel Roads Video
(08/2013) Status: Completed
-
Transportation Investment and Economic Development in Minnesota Counties
(08/2013) Status: Completed
-
Minnesota Steel Culvert Pipe Service Life Map
(07/2013) Status: Completed
-
Transportation Policy and Economic Competitiveness
(07/2013) Status: Completed
-
Developing a Digital Highway Framework to Serve County Roads
(07/2013) Status: Completed
-
High Capacity Manual Unsignalized Crosswalk Level of Service Training
(06/2013) Status: Completed
-
Advanced Solutions to Capture Mobility Data
(06/2013) Status: Completed
-
Investigation of Optimal Mix Design of Full Depth Reclamation Stabilization with Cement and Emulsion
(06/2013) Status: Completed
-
Research Services Report Publication Services - Fiscal Year 2014
(06/2013) Status: Completed
-
Local Technical Assistance Program - Fiscal Year 2014
(06/2013) Status: Completed
-
Development of an Improved Design Procedure for Unbonded Concrete Overlays
(06/2013) Status: Active
-
Effect of Temperature on Prestressed Concrete Bridge Girder Strand Stress During Fabrication
(06/2013) Status: Completed
-
Guidelines for Permeable Pavement Systems
(06/2013) Status: Completed
-
Sustainability for Superbus
(06/2013) Status: Completed
-
Implementation of a Low-Cost Weigh-in-Motion System
(06/2013) Status: Completed
-
Concrete Strength Required to Open to Traffic
(06/2013) Status: Completed
-
SLPP/CTS Transportation Outreach Program
(06/2013) Status: Completed
-
SmarTrAC: A Smartphone Solution for Travel and Activity Capturing
(06/2013) Status: Completed
-
Impact of Lower Asphalt Binder for Coarse HMA Mixes
(06/2013) Status: Completed
-
Development of Guidelines for Work Zone Diversion Rate and Capacity Reduction
(05/2013) Status: Completed
-
Exploring Strategies for Promoting Modal Shifts to Transitways
(05/2013) Status: Completed
-
Flagger Operations: Investigating their Effectiveness in Capturing Driver Attention
(05/2013) Status: Completed
-
I-35E MnPASS Extension Community Outreach and Education Study (SP# 6281-46)
(05/2013) Status: Completed
-
Assessing the Use of Willow Shrub Species on Living Snow Fence Designs to Manage the Damaging Effects of Salt
(05/2013) Status: Completed
-
Implementing Bicycle and Pedestrian Traffic Counts and Data Collection
(04/2013) Status: Completed
-
Deployment of Portable WIM Systems at ATR Sites for Data Collection and Comparative Study
(04/2013) Status: Completed
-
Thickness and Bond Detection at MnROAD using Ultrasonic Tomography
(04/2013) Status: Completed
-
Optimizing Automatic Traffic Recorders Network in Minnesota
(04/2013) Status: Completed
-
Transportation Planning to Support Economic Development in Minnesota
(04/2013) Status: Completed
-
Human Factors of Vehicle-Based Lane Departure Warning Systems
(04/2013) Status: Completed
-
Quantifying the Economic Impact of Bicycling: A Literature Review with Implications for Minnesota
(04/2013) Status: Completed
-
Travel Behavior Over Time
(04/2013) Status: Completed
-
Web-Based Preventative Blowing and Drifting Snow Control Calculator Decision Tool
(04/2013) Status: Completed
-
Statistical Analysis of Fare Compliance
(03/2013) Status: Completed
-
Rural Intersection Conflict Warning System (RICWS) Reliability Evaluation
(02/2013) Status: Completed
-
Toward Zero Deaths Strategic Visioning Workshop
(02/2013) Status: Completed
-
Fiscal Year 2013 Highway Safety and Capacity Workshops for MnDOT
(01/2013) Status: Completed
-
Understanding District 8 Manufacturers' Perspectives on Transportation: An Industry Cluster Approach
(01/2013) Status: Completed
-
Enabling the Next Generation of Super Hybrid Transit Bus
(01/2013) Status: Completed
-
Complete Streets Guidance Document
(01/2013) Status: Completed
-
Septic System Evaluation at MnDOT Rest Stops and Truck Garages
(01/2013) Status: Completed
-
Can behavioral interventions be too salient? Evidence from traffic safety messages
(01/2013) Status: Completed
-
Demand Focused Smart Energy Management in End User Environments for Sustainable Cities
(01/2013) Status: Completed
-
2013 Environmental Stewardship and Streamlining Workshop
(01/2013) Status: Completed