2012
Research Reports
| Active and Completed Projects
Research Reports
-
Development of a Weigh-Pad-Based Portable Weigh-In-Motion
System
December 2012 Report no. MnDOT 2012-38
-
Prediction and Prevention of Tripped Rollovers
December 2012 Report no. CTS 12-33
-
Development of Novel Hydrogen-Based Power Systems for ITS
Applications: Phase-I
December 2012 Report no. CTS 12-38
-
Estimation of Winter Snow Operation Performance Measures with Traffic Data
December 2012 Report no. MnDOT 2012-40
-
Structural Evaluation of Asphalt Pavements with Full-Depth
Reclaimed Base
December 2012 Report no. MnDOT 2012-36
-
Inexpensive 2D Optical Sensor for GPS Augmentation
December 2012 Report no. CTS 12-37
-
Analysis of GPS-based Real Time Attitude Determination
System for ITS Application
November 2012 Report no. CTS 12-36
-
Access to Destinations: Annual Accessibility Measure for the Twin Cities Metropolitan Area
November 2012 Report no. MnDOT 2012-34
-
Assessing Neighborhood and Social Influences of Transit Corridors (Research Brief)
October 2012 Report no. CTS Research Brief 2012-05
-
Development of Next Generation Simulation Models for the Twin Cities Freeway Metro-Wide Simulation Model-Phase 1
October 2012 Report no. CTS 12-34
-
Portable, Non-Intrusive Advance Warning Devices for Work
Zones with or without Flag Operators
October 2012 Report no. MnDOT 2012-26
-
Integrated Approach for Nonintrusive Detection of Driver Drowsiness
October 2012 Report no. CTS 12-32
-
Vehicle Probe Based Real-Time Traffic Monitoring on Urban Roadway Networks
October 2012 Report no. CTS 12-35
-
Accessibility, Network Structure, and Consumers' Destination
Choice: A GIS Analysis of GPS Travel Data and the CLUSTER
Simulation Module for Retail Location Choice
October 2012 Report no. CTS 12-14
-
Full-Depth Precast Concrete Bridge Deck System: Phase II
October 2012 Report no. MnDOT 2012-30
-
Maximizing the Benefits of Transitway Investment (Research Summary)
September 2012 Report no. CTS 12-16PS
-
Intelligent Pavement for Traffic Flow Detection - Phase I
September 2012 Report no. CTS 12-29
-
A Research Plan and Report on Factors Affecting Culvert Pipe
Service Life in Minnesota
September 2012 Report no. MnDOT 2012-27
-
Maximizing the Benefits of Transitway Investment (Final report)
September 2012 Report no. CTS 12-16
-
Investigation of Pedestrian/Bicyclist Risk in Minnesota
Roundabout Crossings
September 2012 Report no. MnDOT 2012-28
-
Estimation of Vehicle's Lateral Position via the Lucas-Kanade
Optical Flow Method
September 2012 Report no. CTS 12-31
-
ITS and Transportation Safety: EMS System Data Integration to Improve Traffic Crash Emergency Response and Treatment - Phases IV and V
September 2012 Report no. CTS 12-27
-
Intelligent Pavement for Traffic Flow Detection - Phase II
September 2012 Report no. CTS 12-30
-
Leveraging Socially Networked Mobile ICT Platforms for the Last-Mile Delivery Problem
August 2012 Report no. 10.1021/es301302k
-
Instrumentation, Monitoring, and Modeling of the I-35W Bridge
August 2012 Report no. MnDOT 2012-24
-
Traffic Data Quality Verification and Sensor Calibration for
Weigh-In-Motion (WIM) Systems
August 2012 Report no. CTS 12-26
-
Aggregating VMT within Predefined Geographic Zones by
Cellular Assignment: A Non-GPS-Based Approach to Mileage-Based Road Use Charging
August 2012 Report no. CTS 12-28
-
Estimating and Measuring Arterial Travel Time and Delay
August 2012 Report no. CTS 12-20
-
Investigation of Low Temperature Cracking in Asphalt
Pavements, National Pooled Fund Study -Phase II
August 2012 Report no. MnDOT 2012-23
-
Investigating the Effectiveness of Intelligent Lane Control Signals on Driver Behavior
August 2012 Report no. MnDOT 2012-22
-
Potential Benefits of Mileage-Based User Fees to the Freight Industry and Industry Concerns
August 2012 Report no. MnDOT 2012-19
-
Using a Smartphone App to Assist the Visually Impaired at Signalized Intersections
August 2012 Report no. CTS 12-25
-
Understanding the Use of Non-Motorized Transportation
Facilities
July 2012 Report no. CTS 12-24
-
Highway Cost Allocation and Determination of Heavy Freight
Truck Permit Fees
July 2012 Report no. MnDOT 2012-14
-
ITS Personal Data Needs: How Much Do We Really Need to Know?
July 2012 Report no. CTS 12-21
-
Assessing Neighborhood and Social Influences of Transit
Corridors
July 2012 Report no. CTS 12-19
-
Identifying Issues Related to Deployment of Automated Speed
Enforcement
July 2012 Report no. CTS 12-23
-
Development and Field Demonstration of DSRC Based V2V-Assisted
V2I Traffic Information System for the Work Zone
June 2012 Report no. CTS 12-18
-
Enhancing Bridge Safety and Operation with
Response Modification (Research Brief)
June 2012 Report no. CTS Research Brief 2012-04
-
Validation of Prestressed Concrete I-Beam Deflection and Camber Estimates
June 2012 Report no. MnDOT 2012-16
-
Development of a New Tracking System Based on CMOS Vision Processor Hardware, Phase II Prototype Demonstration
May 2012 Report no. CTS 12-08
-
Ultra Reliable Detection of Imminent Collision for Enhanced Occupant Safety
May 2012 Report no. CTS 12-07
-
The Vehicle Speed Impacts of a Dynamic Horizontal Curve
Warning Sign on Low-Volume Local Roadways
May 2012 Report no. CTS 12-12
-
Improving the Safety and Efficiency of Roadway Maintenance
Phase I: Developing a Robotic Roadway Message Painter
Prototype
May 2012 Report no. CTS 12-17
-
Smartphone-Based Travel Experience Sampling and Behavior Intervention among Young Adults
May 2012 Report no. CTS 12-11
-
Assessment and Recommendations for the Operation of Standard Sumps as Best Management Practices for Stormwater Treatment (Volume 2)
May 2012 Report no. MnDOT 2012-13
-
Maximizing the Benefits of Transitway Investment (Research Brief)
May 2012 Report no. CTS Research Brief 2012-03
-
A Tracking-Based Traffic Performance Measurement System for Roundabouts and Intersections
May 2012 Report no. CTS 12-10
-
Infrared Thermal Camera-Based Real-Time Identification and Tracking of Large Animals to Prevent Animal-Vehicle Collisions (AVCs) on Roadways
May 2012 Report no. CTS 12-15
-
Performance Analysis of Squad Car Lighting, Retro-reflective
Markings, and Paint Treatments to Improve Safety at Roadside
Traffic Stops
May 2012 Report no. CTS 12-13
-
Reduction of Accessory Overdrive and Parasitic Loading on a Parallel Electric Hybrid City Bus (Presentation to SAE)
April 2012 Report no. SAE 2012-01-1005 Presentation
-
Reduction of Accessory Overdrive and Parasitic Loading on a Parallel Electric Hybrid City Bus
April 2012 Report no. 10.4271/2012-01-1005
-
Mileage-Based User Fee Policy Study: Supporting Technical Information
April 2012 Report no. MnDOT 2012-11
-
Development of Best Practices for Inspection of PT Bridges in Minnesota
April 2012 Report no. MnDOT 2012-09
-
Cooperative Intersection Collision Avoidance System -- Stop Sign Assist: Experiments to Validate Use of an In-Vehicle Interface Design
April 2012 Report no. CTS 12-09
-
Effects of Implements of Husbandry (Farm Equipment) on Pavement Performance
April 2012 Report no. MnDOT 2012-08
-
How Affordable is Transportation?: A Context-Sensitive Framework (Research Brief)
March 2012 Report no. CTS Research Brief 2012-02
-
Connected Vehicles Program: Driver Performance and Distraction Evaluation for In-vehicle Signing
March 2012 Report no. CTS 12-05
-
Scaling of Static Fracture of Quasibrittle Structures: Strength, Lifetime and Fracture Kinetics
February 2012 Report no. 10.1115/1.4005881
-
Economic and Environmental Costs and Benefits of Living Snow Fences: Safety, Mobility, and Transportation Authority Benefits, Farmer Costs, and Carbon Impacts
February 2012 Report no. MnDOT 2012-03
-
Benefit and Cost Analysis of the I-394 MnPASS Program
February 2012 Report no. CTS 12-03
-
Dynamics of Cross-Sector Collaboration: Minnesota's Urban Partnership Agreement from Start to Finish
February 2012 Report no. CTS 12-04
-
Using Twin Cities Destinations and Their Accessibility as a Multimodal Planning Tool
February 2012 Report no. MnDOT 2012-05
-
Vehicle Speed Impacts of Occasional Hazard (Playground) Warning Signs
February 2012 Report no. MnDOT 2012-06
-
The Public Land Survey Records in Minnesota: An Inventory and Description of the Deputy Surveyor Contracts in the Minnesota Historical Society Collections
January 2012 Report no. CTS 12-02
-
Mechanistic Modeling of Unbonded Concrete Overlay Pavements
January 2012 Report no. MnDOT 2012-02
-
Enhancing Public Engagement in Transportation Policymaking (Research Brief)
January 2012 Report no. CTS Research Brief 2012-01
-
Deployment of Practical Methods for Counting Bicycle and Pedestrian Use of a Transportation Facility
January 2012 Report no. CTS 12-01
-
Development of Freeway Operational Strategies with IRIS-in-Loop Simulation
January 2012 Report no. MnDOT 2012-04
Active and Completed Research Projects
-
Understanding and Enhancing the Value of Freight Economy in Minnesota
(12/2012) Status: Completed
-
Pilot Project to Validate the Results of T-PICS: Phase 1
(12/2012) Status: Completed
-
Pilot Projects to Validate the Results of T-PICS: Phase II
(12/2012) Status: Completed
-
Information and Communications Support for the Minnesota Council on Transportation Access
(11/2012) Status: Completed
-
Estimation of Winter Snow Operation Performance Measures with Traffic Flow Data, Phase 2
(11/2012) Status: Completed
-
Transit Station and Stop Design and Travel Time Perceptions
(11/2012) Status: Completed
-
Automatic Generation of Traffic Signal Timing Plan
(11/2012) Status: Completed
-
Advanced Flexibility in Design and Complete Streets Worskshops and Webinars-Fiscal Year 2013
(10/2012) Status: Completed
-
Toward Zero Deaths Administration and Outreach 2012-2013
(10/2012) Status: Completed
-
Fiscal Year 2013 MnDOT Roundabout Training
(10/2012) Status: Completed
-
Development of a Digital Highway Framework to Facilitate Crash Avoidance
(10/2012) Status: Completed
-
Investigating Deployment Potential for Automated Speed Enforcement in Minnesota
(10/2012) Status: Completed
-
New Export and Data Quality Functions in ATR-TDA and SC-TDA Software Applications for Use with Regional Transportation Management Center Sensor Data
(10/2012) Status: Completed
-
Toward Zero Deaths Conference
(10/2012) Status: Completed
-
Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area
(09/2012) Status: Completed
-
Development of Hybrid DSRC-PCMS Work Zone Information System Using DSRC Based V2V Communication
(09/2012) Status: Completed
-
Disk Shaped Compact Tension Testing of Asphalt Concrete
(09/2012) Status: Completed
-
Proposal for Water Permit Streamlining Task Force Report
(09/2012) Status: Completed
-
Design Considerations for Embankment Protection During Road Overtopping Events
(09/2012) Status: Completed
-
Multimodalism for Small Cities
(09/2012) Status: Completed
-
Evaluation of Concrete and Mortars for Partial Depth Repair
(08/2012) Status: Completed
-
Development of Guidelines for Permitted Left-Turn Phasing Using Flashing Yellow Arrows
(08/2012) Status: Completed
-
Local Technical Assistance Program - Fiscal Year 2013
(08/2012) Status: Completed
-
Evaluate and Develop Innovative Pavement Repair and Patching: Taconite-Based Repair Options
(08/2012) Status: Completed
-
Economic Benefits of Transportation Service Coordination in Minnesota: Case Studies
(08/2012) Status: Completed
-
A Model for Incorporating Slab/Underlying Layer Interaction into the MEPDG Concrete Pavement Analysis Procedures
(08/2012) Status: Completed
-
Minnesota Airport Technical Assistance Program - Fiscal Year 2013 and 2014
(08/2012) Status: Completed
-
Using Smartphone App to Help the Visually Impaired Navigate Work Zones Safely
(08/2012) Status: Completed
-
Development and Integration of Advanced Timber Bridge Inspection Techniques for NBIS
(08/2012) Status: Completed
-
Laboratory Study of Culvert Sedimentation for Fish Passage
(08/2012) Status: Completed
-
Investigation of the Impact the I-94 ATM System has on the Safety of the I-94 Commons High-Crash Area
(08/2012) Status: Completed
-
SmartDrive: A Cleaner and More Efficient Traffic System through Network Vehicles and Infrastructure
(07/2012) Status: Completed
-
Lighting Levels for Isolated Intersections Leading to Safety Improvements
(07/2012) Status: Completed
-
Mechanics-Based Reliability Analysis of Asphalt Structures at Low Temperatures
(07/2012) Status: Completed
-
Research Services Report Publication Services - Fiscal Year 2013
(07/2012) Status: Completed
-
The Impact of Light Rail Transit (LRT) on Sustainable Travel and Obesity
(07/2012) Status: Completed
-
Driver Assist System Pilot for Minnesota Snowplows
(07/2012) Status: Completed
-
MnDOT Review of Disadvantaged Business Enterprise Goals, Disadvantaged Business Enterprises, and Procedures
(07/2012) Status: Completed
-
NiceStations: Optimally Locating NiceRide Minnesota Bike Share Stations
(07/2012) Status: Completed
-
Use of Biomass Wastes (Hydrochars) to Reduce Cement Content in Concrete
(07/2012) Status: Completed
-
Dynamic Pricing and Congestion Pricing: The Case of the MnPASS Program
(07/2012) Status: Completed
-
Linking On-Road Emissions with Traffic Flow Variations
(07/2012) Status: Completed
-
Implementation of High Accuracy Radar Detectors for Traffic Safety Countermeasure Evaluation
(07/2012) Status: Completed
-
Building Local Agency Capacity for Public Engagement in Local Road Systems Planning Decision-Making
(07/2012) Status: Completed
-
Laboratory Performance Test for Asphalt Concrete
(07/2012) Status: Completed
-
Field Evaluation of Friction Measurement and Applicator Control Systems for Winter Road Maintenance on Low Volume Roads
(06/2012) Status: Completed
-
Monitoring of Fracture Critical Steel Bridges - Phase III
(06/2012) Status: Completed
-
MnPASS Modeling and Pricing Algorithm Enhancement
(06/2012) Status: Completed
-
Determination of Effective Impervious Area in Urban Watersheds
(06/2012) Status: Completed
-
Simplified Design Table for Minnesota Concrete Pavements
(06/2012) Status: Completed
-
Anchorage of Shear Reinforcement in Prestressed Concrete Bridge Girders
(06/2012) Status: Completed
-
Value Increase and Value Capture: TH 610 Case Study
(06/2012) Status: Completed
-
Time-Dependent Considerations of I35W St. Anthony Falls Bridge Including Long-Term Monitoring Applications
(06/2012) Status: Completed
-
Field Implementation, Testing, and Refinement of Density Based Coordinated Ramp Control Strategy
(05/2012) Status: Completed
-
State DOT CEO Leadership Forum 2013:Performance-Based Management and Leadership
(05/2012) Status: Completed
-
Minnesota Field Test of CrashHelp
(05/2012) Status: Completed
-
Measuring particulate air pollution using a mobile, bicycle-based platform: Implications for cyclists' and pedestrians' exposure to urban air pollution
(05/2012) Status: Completed
-
Source Apportionment of Perfluorochemicals (PFCs) in Highway Runoff: Are Transportation Activities a Major Source of PFCs?
(05/2012) Status: Completed
-
2012 Truck Weight Enforcement Training Program
(04/2012) Status: Completed
-
2012 Focus Groups for the Local Road Research Board
(03/2012) Status: Completed
-
Reconciling the Public Land Surveying Process and the Available Records
(03/2012) Status: Completed
-
Statewide Cycloplan: A Bicycle Planning Tool with Online Participatory GIS
(02/2012) Status: Completed
-
Minnesota Department of Transportation FY 2012-2014 Disadvantaged Business Enterprise Goals
(01/2012) Status: Completed
-
Truck Weight Compliance Education and Outreach Program - 2012-2013
(01/2012) Status: Completed
-
TERRA Membership Pooled Funds, Fiscal Year 2012-2014
(01/2012) Status: Completed
-
A Comprehensive System for Assessing Truck Parking Availability
(01/2012) Status: Completed
-
Analysis of the Strategic Highway Research Program (SHRP) 2 Naturalistic Driving Study Data
(01/2012) Status: Completed