2015
Research Reports
| Active and Completed Projects
Research Reports
-
Effect of Temperature on Prestressed Concrete Bridge Girder Strand Stress During Fabrication
December 2015 Report no. MnDOT 2015-50
-
National Transit Map - United States: Methodology Report
December 2015 Report no. CTS 15-12
-
Exploring Strategies for Promoting Modal Shifts to Transitways
December 2015 Report no. MnDOT 2015-49
-
Assessing the Impacts of Student Transportation on Public Transit
December 2015 Report no. Metro Transit 2015
-
The Influences of the Hiawatha LRT on Changes in Travel
Behavior: A Retrospective Study on Movers
November 2015 Report no. CTS 15-10
-
Real Estate Development in Anticipation of the Green Line
Light Rail Transit in St. Paul
November 2015 Report no. CTS 15-09
-
Teen Driver Support System (TDSS) Field Operational Test
November 2015 Report no. CTS 16-04
-
Assessing the Use of Shrub-Willows for Living Snow Fences in Minnesota
November 2015 Report no. MnDOT 2015-46
-
Real Estate Development Impacts of Transitway Funding Announcements (Research Brief)
August 2015 Report no. CTS Research Brief 2015-01-V2
-
Estimation of Winter Snow Operation Performance Measures
with Traffic-Flow Data, Phase 2
August 2015 Report no. MnDOT 2015-44
-
Perception of Waiting Time at Transit Stops and Stations (Research Brief)
August 2015 Report no. CTS Research Brief 2015-02
-
Determination of Effective Impervious Area in Urban Watersheds
July 2015 Report no. MnDOT 2015-41
-
Interstate 35E MnPASS Managed Lanes Extension: Little Canada Road to County Road 96 Pre-Implementation Study
June 2015 Report no. CTS 15-05
-
Human Factors of Vehicle-Based Lane Departure Warning Systems
June 2015 Report no. MnDOT 2015-35
-
Laboratory Performance Test for Asphalt Concrete
June 2015 Report no. MnDOT 2015-24
-
Development of Active Traffic Management Strategies for Minnesota Freeway Corridors
June 2015 Report no. MnDOT 2015-26
-
Develop Annual Arterial Congestion Report
June 2015 Report no. MnDOT 2015-32
-
Development of Guidelines for Permitted Left-Turn Phasing
Using Flashing Yellow Arrows.
June 2015 Report no. MnDOT 2015-27
-
Appendix H I-35E MnPASS Extension Land Use Study Support, Encourage, and Enhance Transit & Carpool Use
June 2015 Report no. CTS 15-05 Appendix H
-
Protocols and Criteria for Acoustic Emission Monitoring of Fracture-Critical Steel Bridges
June 2015 Report no. MnDOT 2015-36
-
Travel Behavior Over Time
June 2015 Report no. MnDOT 2015-23
-
Permeable Pavements in Cold Climates: State of the Art and
Cold Climate Case Studies
June 2015 Report no. MnDOT 2015-30
-
Statewide Cycloplan: Bicycle Planning Tool & Participatory GIS
June 2015 Report no. MnDOT 2015-29
-
The Minnesota Bicycle and Pedestrian Counting Initiative: Implementation Study
June 2015 Report no. MnDOT 2015-34
-
Minnesota Steel Culvert Pipe Service-Life Map
June 2015 Report no. MnDOT 2015-31
-
Web-Based Preventative Blowing and Drifting Snow Control Calculator Decision Tool
May 2015 Report no. MnDOT 2015-21
-
Access Across America: Walking 2014 Methodology
May 2015 Report no. CTS 15-04
-
MnPASS Modeling and Pricing Algorithm Enhancement
May 2015 Report no. MnDOT 2015-22
-
Implementation of Traffic Data Quality Verification for WIM
Sites
May 2015 Report no. MnDOT 2015-18
-
Access Across America: Walking 2014
May 2015 Report no. CTS 15-03
-
Development of a Sensor Platform for Roadway Mapping:
Part B - Mapping the Road Fog Lines
April 2015 Report no. MnDOT 2015-11
-
Matrix (Partially Grouted) Riprap Lab Flume Study
April 2015 Report no. MnDOT 2015-15
-
Transportation Investment and Economic Development in Minnesota Counties
April 2015 Report no. MnDOT 2015-12
-
Sediment Transport through Recessed Culverts: Laboratory Experiments
March 2015 Report no. MnDOT 2015-08
-
Evaluating Twin Cities Transitways Performance and their Interaction with Traffic on Neighboring Major Roads
March 2015 Report no. MnDOT 2015-09
-
Impact of Exempting the Recording of Low Level Speed Violations in Minnesota
February 2015 Report no. CTS 15-01
-
SmarTrAC: A Smartphone Solution for Context-Aware Travel and Activity Capturing
February 2015 Report no. 2015 SmarTrAC
-
The Impacts of LRT and Neighborhood Characteristics on Auto Ownership (Research Brief)
January 2015 Report no. CTS Research Brief 2014-02
-
Lighting Levels for Isolated Intersections: Leading to Safety Improvements
January 2015 Report no. MnDOT 2015-05
-
Development and Integration of Advanced Timber Bridge Inspection Techniques for NBIS
January 2015 Report no. MnDOT 2015-01
-
Transportation Planning to Support Economic Development: An Exploratory Study of Competitive Industry Clusters and Transportation in Minnesota
January 2015 Report no. MnDOT 2015-02
Active and Completed Research Projects
-
Snow Control Web Tools: Maintenance and Administration FY16
(12/2015) Status: Completed
-
Those who Need it Most: Maximizing Transit Accessibility and Removing Barriers to Employment in Areas of Concentrated Poverty (Phase 3-Hennepin County)
(12/2015) Status: Completed
-
MnDOT Consultant Workshop, 2016
(12/2015) Status: Completed
-
Cost-competitive Timber Bridge Designs for Long Term Performance
(12/2015) Status: Completed
-
Evaluation of the Smart Work Zone Speed Notification System
(11/2015) Status: Completed
-
Develop a Tool to Determine MnPASS Access Spacing
(11/2015) Status: Completed
-
Assessing the Impact of Pedestrian-Activated Crossing Systems
(11/2015) Status: Completed
-
Specific Strategies for Achieving Transit-Oriented Economic Development: Applying National Lessons to the Twin Cities -- Phase 2
(11/2015) Status: Completed
-
Development of a Road Condition Recovery Time Estimation System for Winter Snow Events
(10/2015) Status: Completed
-
LRRB Focus Groups, 2016 - 2017
(10/2015) Status: Completed
-
Advanced Flexibility in Design and Complete Streets, FY16
(10/2015) Status: Completed
-
Toward Zero Deaths (TZD) Admin/Outreach, 2015-2016
(10/2015) Status: Completed
-
RICWS Evaluation and Design Investigation
(10/2015) Status: Completed
-
RS Report Publication Services, FY16
(10/2015) Status: Completed
-
Towards Zero Deaths (TZD) Conference, 2015-2016
(09/2015) Status: Completed
-
Minnesota Council on Transportation Access (MCOTA) Support - Regional Coordination Workshops/Design Assistance
(09/2015) Status: Completed
-
CPS: TTP Option: Synergy: Collaborative Research: Dynamic Methods of Traffic Control that Impact Quality of Life in Smart Cities
(09/2015) Status: Completed
-
Minnesota Council on Transportation Access (MCOTA) Outreach Support FY16
(09/2015) Status: Completed
-
Project Manager Workshops, FY16
(09/2015) Status: Completed
-
Expanding the Adoption on Private Lands: Blowing and Drifting Snow Control Treatments and the Cost Effectiveness of Permanent versus Non-Permanent Treatment Options.
(09/2015) Status: Completed
-
Feasibility of vibration-based long-term bridge monitoring using I35W St. Anthony Falls Bridge
(09/2015) Status: Completed
-
Administrative Support for the Minnesota Freight Advisory Committee (MFAC) - Fiscal Year 2016
(08/2015) Status: Completed
-
Traffic Sign Retro-Reflectivity Training Workshops FY16
(08/2015) Status: Completed
-
National Accessibility Evaluation
(07/2015) Status: Completed
-
Transportation Policy and Economic Competitiveness, year 3
(07/2015) Status: Completed
-
Local Technical Assistance Program (LTAP), FY16
(07/2015) Status: Completed
-
Hydraulic Power Supply for the Mechanical Testing of Resilient and Sustainable Structures, Pavements, Geomaterials, and Medical Devices
(07/2015) Status: Completed
-
Constrained Market Pricing and Revenue Adequacy: Regulatory Implications for Rail Carriers and Shippers
(07/2015) Status: Completed
-
SRN: Integrated Urban Infrastructure Solutions for Environmentally Sustainable, Healthy and Livable Cities
(07/2015) Status: Completed
-
CPS: Breakthrough: Improving Metropolitan-Scale Transportation Systems with Data-Driven Cyber-Control
(07/2015) Status: Completed
-
Reducing Emissions from Open Burning through Biomass Gasification
(07/2015) Status: Completed
-
In-Vehicle Work Zone Messages
(07/2015) Status: Completed
-
Understanding Manufacturers' Perspectives on Transportation in Four MnDOT Districts: An Industry Cluster Approach
(07/2015) Status: Completed
-
National Summer Transportation Institute (NSTI) at University of Minnesota
(06/2015) Status: Completed
-
MnPAVE-Rigid 2.0
(06/2015) Status: Active
-
Development of Travel Time Reliability Measurement System
(05/2015) Status: Completed
-
A Mechanistic Design Approach for Novel Graphene Nanoplatelet (GNP) Reinforced Asphalt Pavements for Low Temperature Applications
(05/2015) Status: Completed
-
Collaborative Consumption in Peer-to-Peer Car Sharing
(05/2015) Status: Completed
-
Test and Demonstration of Connected Vehicles Applications to Maintenance Operations
(05/2015) Status: Completed
-
Life-Cycle Cost Analysis Tool for Minnesota Pavements
(05/2015) Status: Completed
-
Slope Stabilization and Repair Solutions for Local Government Engineers
(05/2015) Status: Completed
-
Enhanced capabilities of BullReporter and BullConverter
(05/2015) Status: Completed
-
The Transportation Futures Project: Planning for Technology Change
(04/2015) Status: Completed
-
Exploring Walking Tolerance of Transitway Users
(04/2015) Status: Completed
-
Expanding the Success of Salt-Tolerant Roadside Turfgrasses through Innovation and Education
(04/2015) Status: Completed
-
Comparing Properties of Water Absorbing/Filtering Media for Bioslope/Bioswale Design
(04/2015) Status: Completed
-
Weigh-In-Motion (WIM) Sensor and Controller Operation and Performance Comparison
(04/2015) Status: Completed
-
Pothole Prevention and Innovative Repair
(04/2015) Status: Completed
-
Investigate the Effectiveness of Using Bluetooth Low Energy (BLE) Technology to Trigger In-Vehicle Messages at Work Zones
(04/2015) Status: Completed
-
University of Minnesota Snow Control Web Tools: Maintenance and Administration
(03/2015) Status: Completed
-
Regional Accessibility Website
(03/2015) Status: Completed
-
Advanced Flexibility in Design and Complete Streets, FY15
(03/2015) Status: Completed
-
Building Expertise for Connected Vehicle Safety Applications
(02/2015) Status: Completed
-
American Association of State and Highway Transportation Officials, Subcommittee on Bridges and Structures, Meeting
(02/2015) Status: Completed
-
App: Travel and Activity Recapper
(01/2015) Status: Completed
-
Spatial and Skills Mismatch of Unemployment and Job Vacancies: Opportunities for Integrated Transit and Workforce Development
(01/2015) Status: Completed
-
Innovative Technology Workshop on 3D Lidar
(01/2015) Status: Completed
-
New CEO Orientation and Peer Exchange
(01/2015) Status: Completed
-
Integration of Advanced Timber Bridge Inspection Techniques
(01/2015) Status: Completed