2014
Research Reports
| Active and Completed Projects
Research Reports
-
Developing Salt-Tolerant Sod Mixtures for Use as Roadside
Turf in Minnesota
December 2014 Report no. MnDOT 2014-46
-
Modeling and Monitoring the Long-Term Behavior of Post-Tensioned Concrete Bridges
November 2014 Report no. MnDOT 2014-39
-
Rural and Small Urban Multimodal Alternatives for
Minnesota
November 2014 Report no. MnDOT 2014-42
-
Evaluation of Concrete and Mortars for Partial Depth Repairs
November 2014 Report no. MnDOT 2014-41
-
Anchorage of Shear Reinforcement in Prestressed Concrete Bridge Girders
October 2014 Report no. MnDOT 2014-36
-
A Next Generation Non-Distracting In-Vehicle 511 Traveler Information Service
October 2014 Report no. CTS 14-13
-
Access Across America: Transit 2014
September 2014 Report no. CTS 14-11
-
Access Across America: Transit 2014 Methodology
September 2014 Report no. CTS 14-12
-
Statistical Analysis of Fare Compliance
August 2014 Report no. CTS 14-08
-
Scour Monitoring Technology Implementation
August 2014 Report no. MnDOT 2014-37
-
Assessing and Improving Pollution Prevention by Swales
August 2014 Report no. MnDOT 2014-30
-
Automatic Generation of Traffic Signal Timing Plan
August 2014 Report no. MnDOT 2014-38
-
Development and Evaluation of Effective Turbidity Monitoring Methods for Construction Projects
July 2014 Report no. MnDOT 2014-24
-
Simplified Design Table For Minnesota Concrete Pavements
July 2014 Report no. MnDOT 2014-27
-
Implementation of High Accuracy Radar Detectors for Traffic Safety Countermeasure Evaluation
June 2014 Report no. CTS 14-05
-
Evaluation of the Effect of MnPASS Lane Design on Mobility and Safety
June 2014 Report no. MnDOT 2014-23
-
Uncontrolled Pedestrian Crossing Evaluation Incorporating Highway Capacity Manual Unsignalized Pedestrian Crossing Analysis Methodology
June 2014 Report no. MnDOT 2014-21
-
Development of a Sensor Platform for Roadway Mapping: Part A - Road Centerline and Asset Management
June 2014 Report no. CTS 14-09
-
Minnesota Department of Transportation Rural Intersection Conflict Warning System (RICWS) Reliability Evaluation
June 2014 Report no. CTS 14-07
-
Options for Automated Speed Enforcement Pilot Projects in Minnesota Work and School Zones
May 2014 Report no. CTS 14-06
-
Investigation of the Impact of the I-94 ATM System on the Safety of the I-94 Commons High Crash Area
May 2014 Report no. MnDOT 2014-19
-
Building Local Agency Capacity for Public Engagement in Local Road Systems Planning and Decision Making
May 2014 Report no. MnDOT 2014-17
-
Acoustic Emission Monitoring of a Fracture-Critical Bridge
March 2014 Report no. MnDOT 2014-15
-
Dakota County Human Services Research and Transportation Planning: Strategic Action Plan
March 2014 Report no. CTS 14-14
-
Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area
March 2014 Report no. MnDOT 2014-14
-
Nice Stations: An Exploration of Nice Ride Bike Share
Accessibility and Station Choice
February 2014 Report no. CTS 14-03
-
Advanced LED Warning System for Rural Intersections: Phase
2 (ALERT-2)
February 2014 Report no. MnDOT 2014-10
-
Development of a Navigation System Using Smartphone and Bluetooth Technologies to Help the Visually Impaired Navigate Work Zones Safely
February 2014 Report no. MnDOT 2014-12
-
Innovative Parking Pricing Demonstration in the Twin Cities: Introducing Flexibility and Incentives to Parking Contracts
February 2014 Report no. CTS 14-02
-
Quantifying Moisture Effects in DCP and LWD Tests Using
Unsaturated Mechanics
February 2014 Report no. MnDOT 2014-13
-
Estimating the Crash Reduction and Vehicle Dynamics Effects of Flashing LED Stop Signs
January 2014 Report no. MnDOT 2014-02
-
Reconciling the Public Land Surveying Records in Minnesota
January 2014 Report no. CTS 14-01
-
Value Increase and Value Capture: The Case of TH-610 in Maple Grove, Minnesota
January 2014 Report no. MnDOT 2014-03
-
Effect of Signing and Lane Markings on the Safety of a Two-Lane Roundabout
January 2014 Report no. MnDOT 2014-04
-
Expanding and Streamlining of RTMC Freeway Network Performance Reporting Methodologies and Tools
January 2014 Report no. MnDOT 2014-05
Active and Completed Research Projects
-
Institutionalizing Bicycle and Pedestrian Traffic Counts and Data Collection
(12/2014) Status: Completed
-
Asphalt Mixture Performance Testing for Thermal Cracking
(12/2014) Status: Completed
-
Exploring Links Between Medical Conditions and Safety Performance in Tractor Trailer Drivers
(12/2014) Status: Completed
-
Ephemeral Network Broker to facilitate Future Mobility Business Models
(12/2014) Status: Completed
-
Project Schedule Management Training
(12/2014) Status: Completed
-
Use of Mussel Spat Rope for Fish Passage in Culverts
(11/2014) Status: Completed
-
Using GIS to Improve Tribal Traffic Safety
(11/2014) Status: Completed
-
Environmental Workshop, 2015
(11/2014) Status: Completed
-
Operational Research Program for Local Transportation Groups (OPERA), FY15
(11/2014) Status: Completed
-
Toward Zero Deaths (TZD) Admin/Outreach, 2014-2015
(10/2014) Status: Completed
-
Project Manager Workshop
(10/2014) Status: Completed
-
Older Driver Support System (ODSS) Usability and Design Investigation
(10/2014) Status: Completed
-
Research on Composite Pile Behavior and Development of a Rock Strength Database
(10/2014) Status: Completed
-
Administrative Support for the Minnesota Freight Advisory Committee (MFAC) - Fiscal Year 2015
(10/2014) Status: Completed
-
Understanding District 4 Manufacturers' Perspectives on Transportation: An Industry Cluster Approach
(09/2014) Status: Completed
-
The Impacts of Transportation Investments on Economic Growth in the Twin Cities
(09/2014) Status: Completed
-
Toward Zero Deaths (TZD) Conference, 2014-2015
(09/2014) Status: Completed
-
The Effects of Transitways on Auto Ownership and Auto Use: Evidence from the Hiawatha LRT
(09/2014) Status: Completed
-
Examination of Driver Performance and Distraction with In-Vehicle Signing
(09/2014) Status: Completed
-
Transportation Engineering and Road Research Alliance (TERRA) Pooled fund Support, FY15
(09/2014) Status: Completed
-
Research Services Report Publication Services, FY15
(09/2014) Status: Completed
-
Development of a Controlled-Trajectory Rapid Compression and Expansion Machine to Enable Fundamental Research on the Internal Combustion Engine
(09/2014) Status: Completed
-
Airport Technical Assistance Program (AirTAP), FY15-16
(09/2014) Status: Completed
-
Identifying and Reconciling Stakeholder Perspectives in Deploying Automated Speed Enforcement
(08/2014) Status: Completed
-
Alcohol-Related Hot-Spot Analysis and Prediction for Improving DWI/OVI Law Enforcement
(08/2014) Status: Completed
-
Improving Railroad Grade Crossing Safety: Accurate Prediction of Train Arrival Times for Emergency Response Management and Driver Decision Support
(08/2014) Status: Completed
-
Specific Strategies for Achieving Transit-Oriented Economic Development: Applying National Lessons to the Twin Cities -- Phase 1
(08/2014) Status: Completed
-
Improving Railroad Grade Crossing Safety: Positioning, Planning, and Operation of Emergency Response Resources and Coordination Between Jurisdictions
(08/2014) Status: Completed
-
Safety in Numbers? Accessibility, Traffic, and Safety of Nonmotorized Travelers
(08/2014) Status: Completed
-
Directional Rumble Strips for Reducing Wrong-Way-Driving Freeway Entries
(08/2014) Status: Completed
-
Improving Railroad Grade Crossing Safety: Accident Prediction Models Using Macro- and Micro-Scale Analysis
(08/2014) Status: Completed
-
Implementation of a V2I Highway Safety System and Connected Vehicle Testbed
(08/2014) Status: Completed
-
Local Technical Assistance Program (LTAP) FY2015
(07/2014) Status: Completed
-
Assessing the Impacts of Student Transportation on City Buses and Trains
(07/2014) Status: Completed
-
Bio-Fog Seal Evaluation
(07/2014) Status: Completed
-
Assessing the Economic Impact and Health Effects of Bicycling in Minnesota
(07/2014) Status: Completed
-
Local Road Safety Outreach Materials
(07/2014) Status: Completed
-
PCC Pavement Thickness Variation Versus Observed Pavement Distress
(07/2014) Status: Completed
-
Framework and Guidelines for the Development of a Twin Cities Meso-DTA Model
(07/2014) Status: Completed
-
Performance Measures for Bicycle and Pedestrian Safety: Methodologies for Monitoring Traffic Volumes and Assessing Exposure to Risk
(07/2014) Status: Completed
-
Disc Shaped Compact Tension (DCT) Specifications Development for Asphalt Pavement
(07/2014) Status: Completed
-
Traffic Impacts of Bicycle Facilities
(07/2014) Status: Completed
-
A Positioning and Mapping Methodology Using Bluetooth and Smartphone Technologies to Support Situation Awareness and Wayfinding for the Visually Impaired
(07/2014) Status: Completed
-
Collaborating with American Indian Communities to Re-Interpret and Strategize About Transportation Safety Risks in Tribal Lands
(07/2014) Status: Completed
-
Stakeholder Attitudes, Knowledge and Engagement in Local Road Systems Planning and Decision-Making
(07/2014) Status: Completed
-
Factors Affecting the Adoption of Evidence-Based Approaches to Road Safety by State Policymakers
(07/2014) Status: Completed
-
Collaborating with American Indians to Re-Interpret and Strategize About Transportation Safety
(06/2014) Status: Completed
-
Examining the Impact of ASE in Work Zones on Driver Attention
(06/2014) Status: Completed
-
Full Depth Reclamation (FDR) for Suburban/Urban and Local Roads Application
(06/2014) Status: Completed
-
Development and Demonstration of Merge-Assist System Using Connected Vehicle Technology
(06/2014) Status: Completed
-
Safety Study of I-35W Improvements Done Under UPA Project
(06/2014) Status: Completed
-
Study of De-icing Salt Accumulation and Transport Through a Watershed
(05/2014) Status: Completed
-
Estimation of Traffic Conflicts at Signalized Intersections Using High-Resolution Traffic Signal Data
(05/2014) Status: Completed
-
Development of a Queue Warning System Utilizing ATM Infrastructure: System Development and Field Testing
(05/2014) Status: Completed
-
Evaluation of Safety and Mobility of Two-Lane Roundabouts
(05/2014) Status: Completed
-
Driver Behavior in Left-Turn and Other Two-Vehicle Crashes
(05/2014) Status: Completed
-
Novel Collision-Avoidance System for Bicycles
(05/2014) Status: Completed
-
High Fidelity Simulation of Bridge Foundation Scour at the Mississippi River Bridge, Bridge No. 9321
(04/2014) Status: Completed
-
Culvert Length and Interior Lighting Impacts to Topeka Shiner Passage
(04/2014) Status: Completed
-
Verification of Pavement Structures and Deflection Effects on Vehicle Fuel Economy and GHG Emission
(03/2014) Status: Completed
-
Economic Development Impacts of Bus Rapid Transit
(03/2014) Status: Completed
-
DSRC-Based Warning System for Worker Safety
(03/2014) Status: Completed
-
Sensing for HOV/HOT Lanes Enforcement
(03/2014) Status: Completed
-
The Anticipation of Rail Transit and Real Estate Development: Evidence from Green Line in St. Paul
(02/2014) Status: Completed
-
Local Road Research Board Focus Groups, FY14-15
(02/2014) Status: Completed
-
Evaluation Update on the Effectiveness of the Minnesota Primary Seatbelt Law
(01/2014) Status: Completed
-
Computerized Crash Reports Usability and Design Investigation
(01/2014) Status: Completed
-
New Jersey Transit Disparity Study
(01/2014) Status: Completed