Congestion
Research Reports
| Active and Completed Projects
Research Reports
-
Evaluation and Refinement of Minnesota Queue Warning Systems
March 2023, MnDOT 2023-05
-
Pressure-based dispatch for shared autonomous vehicles
August 2019, CTS 19-26
-
Task 12: ABC Ramps Outreach and Marketing Plan
April 2019, ABC-Task 12
-
Task 2: History of ABC Ramps
April 2019, ABC-Task 2
-
Task 3: Corridor Review - Current and Planned
April 2019, ABC-Task 3
-
Task 4: Demographics of the ABC Ramps
April 2019, ABC-Task 4
-
Task 5: Travel Demand Management Landscape
April 2019, ABC-Task 5
-
Task 6: Regional Stakeholder Transportation Goals
April 2019, ABC-Task 6
-
Task 9: Encouraging Carpooling, Biking, and Transit Use at the ABC Ramps
April 2019, ABC-Task 9
-
Task 8: Policy, Ordinance, Statute and Guidance Review
April 2019, ABC-Task 8
-
Task 10: Long Range Transportation Trends
April 2019, ABC-Task 10
-
The ABC Parking Ramps in Minneapolis: A Unique Past. A Visionary Future.
March 2019, MnDOT 2019-13
-
Task 13: Transportation Options Implementation Plan
March 2019, ABC-Task 13
-
Task 11: Stakeholder Engagement Summary Report
August 2018, ABC-Task 11
-
Access Across America: Auto 2015
September 2016, CTS 16-07
-
Development of Active Traffic Management Strategies for Minnesota Freeway Corridors
June 2015, MnDOT 2015-26
-
Develop Annual Arterial Congestion Report
June 2015, MnDOT 2015-32
-
Investigation of the Impact of the I-94 ATM System on the Safety of the I-94 Commons High Crash Area
May 2014, MnDOT 2014-19
-
Effectiveness of Urban Partnership Agreement Traffic Operations
Measures in the I-35W Corridor
August 2013, CTS 13-22
-
Improving Traffic Signal Operations for Integrated Corridor
Management
July 2013, MnDOT 2013-17
-
Mitigating Highway Construction Impacts Through the Use of
Transit
May 2013, MnDOT 2013-13
-
Access Across America: Auto 2013
April 2013, CTS 13-20
-
Access to Destinations: Annual Accessibility Measure for the Twin Cities Metropolitan Area
November 2012, MnDOT 2012-34
-
Estimating and Measuring Arterial Travel Time and Delay
August 2012, CTS 12-20
-
Benefit and Cost Analysis of the I-394 MnPASS Program
February 2012, CTS 12-03
-
The Urban Partnership Agreement: A Comparative Study of
Technology and Collaboration in Transportation Policy
Implementation
April 2011, CTS 11-07
-
Development of the Next Generation Stratified Ramp Metering
Algorithm Based on Freeway Density
March 2011, CTS 11-05
-
Study of Public Acceptance of Tolling with New Capacity and
Credits: Concepts of FAST Miles and FEE Lanes
July 2010, Mn/DOT 2010-27
-
I-394 Phase II Planning Study
July 2010, CTS 10-08
-
Improving Minneapolis/St. Paul's Ramp Metering System for Smoother Traffic Flow
April 2009, 200751TS
-
Minnesota Value Pricing Outreach and Education
October 2006, MnDOT 2006-38
-
Access to Destinations: Development of Accessibility Measures
May 2006, MnDOT 2006-16
-
Duluth Entertainment Convention Center (DECC) Special Events Traffic Flow Study
June 2003, CTS 04-08
-
Minnesota Value Pricing Project
March 2003, MnDOT 2003-31
-
Development and application of on-line strategies for optimal intersection control : phase III
October 1996, Mn/DOT 1996-33
-
Development and Application of On-Line, Integrated Control Strategies for Optimal Metering, Incident Management and Driver Guidance in Freeway Networks : Phase I Final Report.
April 1993, Mn/DOT 1994-13
-
Urban Congestion Reduction for Energy Conservation: Control Strategies for Urban Street Systems: A State of the Art: Final Report
January 1988, CTS 1988
Active and Completed Projects
-
Evaluation and Refinement of Minnesota Queue Warning Systems
(09/2018)
-
Pressure-based dispatch for shared autonomous vehicles
(09/2018)
-
ABC Ramps Transportation Options
(10/2016)
-
Develop Annual Arterial Congestion Report
(08/2013)
-
Development of Hybrid DSRC-PCMS Work Zone Information System Using DSRC Based V2V Communication
(09/2012)
-
Investigation of the Impact the I-94 ATM System has on the Safety of the I-94 Commons High-Crash Area
(08/2012)
-
How Do We Keep People on Rural Transit After the Construction Project Ends?
(10/2011)
-
Annual Accessibility Measure for the Twin Cities Metropolitan Region
(09/2011)
-
Development of Active Traffic Management Strategies for Minnesota Freeway Corridors with Enhanced Variable Speed Limit Control System
(09/2011)
-
Improving Traffic Signal Operations for Integrated Corridor Management (ICM)
(02/2011)
-
Mn/DOT's Corridor Coalition Forums
(12/2010)
-
Effectiveness of Urban Partnership Agreement (UPA) Traffic Operations Measures in the I-35W Corridor
(06/2010)
-
Estimating and Measuring Arterial Travel Time and Delay
(11/2009)
-
Benefit-Cost Analysis of Value Pricing: Case Study for MnPass - FY10 TechPlan
(10/2009)
-
Study of Public Acceptance of Tolling Credits
(04/2009)
-
Development of the Next Generation Stratified Ramp Metering Algorithm Based on Freeway Density
(12/2008)
-
Minnesota UPA Telework Component
(09/2008)
-
The Urban Partnership Agreement: A Comparative Study of Technology and Collaboration in Transportation Policy Implementation- FY09 Tech Plan
(08/2008)
-
Operation of Traffic Systems in Oversaturated Conditions
(01/2008)
-
I-394 MnPASS: Enforcement, Planning, Outreach and Education
(05/2006)
-
Minnesota Value Pricing Outreach and Education
(03/2003)
-
Minnesota Value Pricing
(01/2000)